最新风电场运维人员技能考试试卷(The latest wind farm maintenance personnel skills test paper).docVIP

最新风电场运维人员技能考试试卷(The latest wind farm maintenance personnel skills test paper).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
最新风电场运维人员技能考试试卷(The latest wind farm maintenance personnel skills test paper)

最新风电场运维人员技能考试试卷(The latest wind farm maintenance personnel skills test paper) In 2012, wind farm operation and maintenance personnel Skills exam paper (theoretical section) 1. Fill in the blanks (30 blank, 0.5 points each, 15 points) 1. The frequency converter is classified according to the main circuit work mode, which can be divided into voltage frequency converter and current frequency converter. 2. The cabin can rotate in two directions, and the rotation direction is detected by the proximity switch. When the cabin reaches its limit in the same direction, the limit switch will send the signal to the control unit, and the control unit will stop quickly and reverse the cable. 3. The preventive maintenance of the wind power units in strict accordance with the maintenance schedule provided by the manufacturer is scheduled maintenance. 4. The frequency of the power system operation is controlled by the active power of the system. The voltage is controlled by the reactive power of the system. 5. PT100 sensor resistance value and temperature conversion: on the relationship between resistance value for 100 Ω temperature 0 ℃. 6. The working tickets should be in duplicate, one should be kept in the work place and the other shall be held by the work permit. 7. If the wind speed exceeds a finite value, such as the average of 5 or 10 minutes (mean wind speed) and 5 seconds average (gusty speed), the work must be stopped immediately. No maintenance or repair work shall be performed. The blade is located in any position between position and the position of the paddle. 8. The data points measured by wind electric field test tower are located at the height of the fan hub and should contain parameters such as wind speed, wind direction, air temperature and air pressure. 9. Increasing the tower height of generator sets can reduce the impact of turbulence intensity. 10. The insulation grade of the generator of wind power generator sets is generally F grade. 11. The zero sequence vo

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档