- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
氨缓冲罐问题(Ammonia buffer tank problem)
氨缓冲罐问题(Ammonia buffer tank problem)
Indicate that the flange welding of the equipment is finished.
Pipe flange forging with 16Mn forging. Two pipe flanges need to be calculated for the hole reinforcement
The equipment can be soldered automatically, indicating automatic welding joint and welding rod selection.
By the way, why do you want 100%?
Because of the welding seam coefficient is 1, 100% shooting for, of course can choose the coefficient of 0.85 20% RT, but cant say it wrong, tube flange forging with 16 mn Ⅱ is right, not the 16 mn forging,
Technical error (blunder) :
1. The support material is returned, and the material of the q235-a / 16MnR mat should be marked in the back
2. The main pressure increase 16 mn Ⅱ materials
The technical feature table does not specify the dielectric feature (also the small fault).
Small mistake: not a lot, if all CD kind of welds require 100 % MT a bit too much, the corrosion allowance of 3 have what basis (heavy corrosion?) The flange of the equipment has no nodal diagram, the concave surface and the convex surface which are not clearly defined, how to make the factory. No nameplate location. The supporting block is marked with 4 pieces of all cloth, pressure ring and so on. Take over the material 20 forging mark wrong, must use forging piece also not such standard method. The heat treatment of the equipment after integral welding may not be such a high requirement.
In addition, there is no straight edge height of the head. Neither indicated nor reflected in the detail column.
In general, mistakes are not too many, and the general feeling improves the design requirements. Ammonia is not a dangerous medium.
The personal views are discussed in a few different ways with pretty.
1) cause and effect, when the design not for weld radiographic testing length coefficient of 1, so only 100% of RT, I think should be determined by equipment situation 100% RT and then need to weld coefficient 1. This equipment is local test is ok, I think,
您可能关注的文档
- 探究杠杆的平衡条件(Explore the balance of leverage).doc
- 探究房地产企业加强工程质量控制的措施(To explore the measures to strengthen the quality control of real estate enterprises).doc
- 探索者使用技巧(The seeker USES skill).doc
- 探讨大秦铁路的价值所在(Discussion the value of the great qin railway).doc
- 探讨水上加油站防雷防静电(Discuss the anti-lightning protection of the water station).doc
- 探讨绅士必备之万能外套(Explore the all-purpose coat of a gentleman).doc
- 拳皇97小猴飞钻(The boxer's 97 little monkey fly).doc
- 接地安装(Grounding installation).doc
- 排列组合问题的求解策略(The solution strategy of permutation combination problem).doc
- 接地技术(Grounding technology).doc
- 氮化处理(Nitriding treatment).doc
- 民营企业如何长久的发展下去(How can private enterprises develop for a long time).doc
- 水力学A 课程教学大纲(Water mechanics A course syllabus).doc
- 水力除焦系统的技术改进span(Technical improvement of hydraulic defocusing system).doc
- 气化炉的应用及其原理(The application of gasifier and its principle).doc
- 水厂特种设备及药剂安全管理(Water plant special equipment and pharmacy safety management).doc
- 水处理运行规程(Water treatment operation procedures).doc
- 水文地质学(hydrogeology).doc
- 水情月报(Water monthly report).doc
- 水暖做法(Plumbing practice).doc
文档评论(0)