- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水暖做法(Plumbing practice)
水暖做法(Plumbing practice)
A1 - A12
B1 - B8
C1 - C12
C13 - C16 # floor
Professional details of plumbing and related requirements
Part one: construction preparation
1. Construction materials are divided into construction unit purchasing, and party a controls two kinds
2. Before purchasing, all materials will be reported to the supervisor and party a in the sample and form test report.
After waiting for confirmation, we can buy in bulk
3. The construction specification is mainly familiar with the specification of construction quality acceptance of construction water supply and drainage and heating engineering.
GB50242-2002.
4. Be familiar with the drawings and make a quantitative purchase of actual demand in the preparation stage
In several
5. Familiar with the relationship between the drawing and other professional conflicts, such as: and air conditioning,
Holes and electrical appliances.
Pipe well internal valve; Whether the meter installation is easy to maintain; Water pipes and doors and Windows
No conflict.
The various pipelines in the tube should be arranged reasonably, according to various types of houses, must be drawn before construction
Sketch guide construction, etc.
Part two: the construction process
All kinds of piping installation strictly follow the principle of the guide, and the post-installation sample must be
To the builder; The approval of the ministry of supervision can be built in a large area.
1. Heating system
The center of the radiator in the window overlaps with the center of the window
150 mm, the vertical degree of the heat sink is controlled within 3 mm, heat sink and supply
The water branch is compact, which is the minimum size installation of the pipe parts, and the radiator mounting
Take the minimum of wall length as the principle.
2. The construction of PPR pipeline shall be attended by all water heating professionals
The degree controlled thermos.
3. The heating; Supply. Return water. The pipe and fittings can not appear above ground le
您可能关注的文档
- 接触法制硫酸(Contact sulfuric acid).doc
- 接触网工技能鉴定复习题---中级工部分(Work skill identification of contact net - intermediate work section).doc
- 接近开关)(Proximity switch).doc
- 控制网平差软件介绍(Introduction of control network adjustment software).doc
- 推健康食品,塑化剂是催化剂(Push healthy food, plasticizer is catalyst).doc
- 推土机的结构与工作原理(The structure and working principle of bulldozer).doc
- 推荐一些跟天气或气候有关的科幻电影(Recommend some science-fiction movies about the weather or climate).doc
- 探讨用整体法处理加速度不等的连接体问题(This paper discusses the problem of the interconnective body with different acceleration).doc
- 掼蛋大法(Whip egg solution).doc
- 控制类提示(Control class prompt).doc
- 水文地质(hydrogeology).doc
- 水果介绍——砂梨(Fruit introduction - pear).doc
- 水槽选购常识(Common sense in the sink).doc
- 水泥混凝土路面病害的防治(Prevention and control of the disease of cement concrete pavement).doc
- 水泥的说!~(Said the cement! ~).doc
- 水泵选型(Pump selection).doc
- 水源热泵中央空调与分体空调比较(Comparison of the central air conditioning of water source heat pump with the air conditioner).doc
- 水洗厂价格成本工资参考(Water wash factory price cost salary reference).doc
- 水泵低频噪声治理方案(Water pump low-frequency noise control scheme).doc
- 氮气密封泵技术学习笔记(Nitrogen seal pump technical study notes).doc
文档评论(0)