资料员习题(The documenter exercises the problem).docVIP

资料员习题(The documenter exercises the problem).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
资料员习题(The documenter exercises the problem)

资料员习题(The documenter exercises the problem) Documenter problem. Txt39 journey of life is not plain sailing, adversity disappointment will often with us, but the glory of the human nature is often displayed in the selected than, hope is to encourage our huge invisible power. Dedication is the love, courage to give, you will receive the unexpected gift. One, the question 1. The project data shall be the original. When a copy is made, a copy should be added to the official seal of the unit, indicating the date of the photocopy and the signature of the person who has the handle. 2. The corrosion prevention and fire retardant coating used in the sub-division of steel structure shall be tested for coating thickness. In the case of the supervision of the station, the supervision of the station should be accurate and accurate. The supervision personnel of the side station and the on-site quality inspection personnel of the construction unit shall sign on the supervision record of the side station. 4. (to) the construction project information management discipline (db11/t - 695 -- 2009) is applicable to the administration of new construction, reconstruction and expansion of construction projects in the administrative region of Beijing. 5. The continuous test run time of the public building lighting system is 24 hours. All lighting fixtures should be turned on, and the running state is recorded every 2 hours, with no failure in the running time. 6. Large lighting lamps shall be carried out in full load test. 7, (wrong) specialized in building engineering of the subcontract works, no matter where the contract project subcontractors shall be according to the construction project information management discipline (DB11 / T - 695-695) requirements will form the construction documents for overall contracting units. (2) the data provided by the construction unit shall be written in parallel with the formation of the data; The data collected by the construction unit shall be compile

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档