重大设计变更要求(Major design change requirements).docVIP

重大设计变更要求(Major design change requirements).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
重大设计变更要求(Major design change requirements)

重大设计变更要求(Major design change requirements) Building professional I. change of functional and plane functions: 1. Change of architectural use nature. Such as office building change to market, restaurant, entertainment, bathroom etc. 2. Changes in the layout of the building (including residences, workshops, office buildings, etc.); 3. Increase and decrease (electrical) ladder and shift; 4. Planar opening increases the Shared space. 2. Change of building height, area, layer height and elevation: 1. Increase the number of layers; 2. Increase or decrease the height; 3. Increase the construction area. Third, the change of construction fire fighting, building energy saving, building waterproof. For example, the change of exterior wall door and window, the change of the external wall insulation system, the change of the enclosed stairway and the smoke proof staircase, etc. Structure of professional 1. Changes in the structure system. Such as the change of cylinder net, shear wall hole change, etc. 2. Change of plane functions. If load change, partition wall position change, plane dimension change, layer height change. Changes in the number of layers. Such as add layer. 4. Basic types of changes. 5. Change of structural materials and components. Electrical professional 1. System changes 1. Change of power supply quantity. If two become one; 2. Change of load level. If changed from level two to level one; 3. Change of trunk distribution mode. If the trunk becomes radioactive; Changes in the location of the equipment that will cause the power supply to change or cause the original distribution system to adjust. 2. Equipment changes 1. Change of main line equipment type. If the cable is turned into a bus slot; Changes in the nature of the load equipment. If it is turned into fire equipment by ordinary equipment. 3. Design capacity changes 1. Exceed design allowable capacity (including design spare capacity). Water supply and drainage 1. Water supply and system changes. 2. Hot w

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档