- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
雷雨安全防护(Thunderstorm safety protection)
雷雨安全防护(Thunderstorm safety protection)
I. preparation measures for the rainy season
1. Arrange the rest time reasonably. Summer working time as far as possible to the ends of the compression, to avoid the heat of the noon, when the temperature more than 37 ℃, stop the outdoor work, should have ventilation cooling measures when working indoors. All operations should be stopped in the event of a larger storm, and the personnel shall be evacuated to a safe place.
2. Make the site drainage.
(1) according to the construction plan and drainage plan, use the natural terrain to determine the drainage direction, and the drainage ditch shall be dug in accordance with the regulations to ensure the unobstructed drainage.
(2) ensure that the roads are unimpeded, and the pavement is hardened or paved with gravel, slag or other materials according to the actual conditions, and the arch is raised as required.
(3) protection of raw materials, finished products and semi-finished products. To regularly check material comprehensive, timely maintenance, good drainage and gives the solid, not leak rain water seepage, steel and other materials to store the corresponding rainproof measures, to ensure the safety of the material quality.
(4) to set up continuous and unimpeded drainage facilities and emergency materials, such as water pumps and related equipment, plastic sheets and linoleum materials, in accordance with the requirements of flood control.
Ii. Key points of the rainy season construction safety measures.
Concrete engineering:
(1) the template isolation layer should master the weather forecast in time to prevent the isolation layer from being washed away by the rain;
(2) if the pouring rain should stop pouring concrete, the site should be covered. The cast-in-place concrete should consider several construction joints in accordance with the structure and possibility. (3) during the construction of rain period, the determination of the water content of concrete coarse aggregate sh
您可能关注的文档
- 野外知识(The field of knowledge).doc
- 量子力学复习指南 - 中国人民大学(Revision of quantum mechanics - renmin university of China).doc
- 金属切削原理与刀具试题(Principles of metal cutting and cutting tools).doc
- 金属开采(Metal mining).doc
- 重装机兵详细攻略(The heavy loader detailed the strategy).doc
- 金属材料的性能(Performance of metal materials).doc
- 金椰园介绍(Introduction of golden coconut garden).doc
- 金属饰面板安装工艺标准(926-1996)(Installation process standard of metal decorative panel (926-1996)).doc
- 金庸群侠传存档修改方法(The golden yong group archives the archive to revise the method).doc
- 金正昆商务礼仪知识要点汇总(Summary of zhengkun's knowledge of business etiquette).doc
- 霍尔位置传感器(Hall position sensor).doc
- 霍尔效应(Hall effect).doc
- 露台漏水浅析!(The terrace is leaky!).doc
- 露水中的声音——洛尔卡与顾城(作者humbert)(The sound of dew - lorca and gu cheng (author humbert)).doc
- 霍霁雪 导盲产品设计前期调研(Preliminary research on the design of huji snow guide products).doc
- 青少年与网络语言(Teenagers and online language).doc
- 青岛市市政公用基础设施特许经营管理暂行规定(The temporary provisions of Qingdao municipal public infrastructure franchise management).doc
- 青岛某公司年终发管理福利 奖励员工学开飞机(A company in Qingdao has a year-end management bonus for employees to learn to fly planes).doc
- 青苔上身(Moss body).doc
- 青藏铁路列车时刻表_票价(The railway train schedule of qinghai-tibet railway).doc
文档评论(0)