- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
黄陵铁路(Huangling railway)
黄陵铁路(Huangling railway)
Preliminary design opinion of huangling - han cheng-hou ma railway (2)
A,
yard
(I) major design principles
1. All new and rebuilt stations are arranged in mar-mar-train layout (except for the north of hou ma), and the arrival line is designed according to the double approach.
2. The effective length of the line shall be designed at 1050 meters (except the horse station), and the arrival line will be extended to the end of the station as far as possible, making full use of the existing equipment and reducing the waste.
The main line is used 60kg 12 fixed frog concrete bifurcation, to the hair line and other station line to try to be as old as possible.
4. Baishui county, city, Yang north, Seoul, qingjian, hejin, JiShan, XinJiang, map of houma 9 stations for passenger transport operations, set up the basic, intermediate platform, platform setting isometric canopy and passengers across the line facilities.
5. Combined with the engineering of this line, integrate the freight facilities of han cheng, xianyu kou, yu gate, hejin and hou ma station, and the remaining freight equipment shall be maintained in principle.
(ii) rail station and new station
Article 1. Baishui county station: a departure line 4 (including main article 2), a basic platform and side type platform, and by 450 m x6 m x0.5 m design, a 6.0 m passengers tunnel 1, reserve a private market conditions.
2. Chengcheng station: agree to set 5 bars (including 2 straight lines), the base platform is 450 meters x6 meters x0.5 meters, the middle platform is 450 meters x 8.5 meters x0.5 meters, and 6 meters passenger tunnel 1. To cancel the original design, the new set of flat warfare will be combined with one piece of loading and unloading line, a 30-meter wide whole column, and one military platform.
3. Ho Yang north station: a departure line 4 (including main article 2), a basic platform and side type platform, and by 450 m x6 m x0.5 m design, a 6.0 m passenger tunnel 1, reserve a privat
您可能关注的文档
- 风电开发(Wind power development).doc
- 风电控制技术(Wind power control technology).doc
- 风荷载信息(Wind load information).doc
- 风险告知(Risk disclosure).doc
- 风雨四十载 执著气象情(The weather and rain are on the line).doc
- 风飘雪词(The wind snow word).doc
- 飞力FLYGT潜水泵(Feili FLYGT submersible pump).doc
- 飞思卡尔规则(The freescale rule).doc
- 飞机上的实用语(The practical language on the plane).doc
- 飞机结构件的表面保护处理(Surface protection of airplane structural parts).doc
- 黑粉虫养殖技术(The technique of black powder).doc
- 黑夜的艺术--古代埃及艺术 - 扬州大学(The art of the night - ancient Egyptian art - yangzhou university).doc
- 黑盒于白盒的区别(The difference between black box and white box).doc
- 高级电气工程师(含答案)2(Senior electrical engineer (including answer) 2).doc
- 黑骏马短篇故事(中英对照)(Black horse short story (Chinese and English)).doc
- 黑鹰坠落(Black hawk down).doc
- 黑鲨基本操作(Black shark basic operation).doc
- 黑龙江2012考研(Heilongjiang 2012 entrance examination).doc
- 黑龙江京亚葡萄管理(Heilongjiang jinya grape management).doc
- 黑龙江省建筑安全员2013考试题(Construction safety officer of heilongjiang province exam question in 2013).doc
文档评论(0)