- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
个别测量技术设计(Individual measurement technology design)
个别测量技术设计(Individual measurement technology design)
1. project overview
This project is located in Beijing City, Dongcheng District Xianghe Road No. 1, south of the airport expressway, adjacent to the East building personnel, West Xibahe Road, North South lane. The entire area from the air corridor will connect the nine towers, residential building, podium and underground garage part located two basement. Engineering design, the absolute elevation of + 0.00m is +42.50 meters, the structural foundation is buried about 0 meters below 11.82 meters.
The supporting forms of foundation pit in this project are soil nailing wall and pile anchor support. The foundation of the building is treated with CFG piles.
2. compilation basis
Engineering survey specifications, deformation measurement norms and construction design of foundation pit construction of Wanguo north area project.
3. construction preparation
3.1 communicate with Party A, design and supervision engineers in advance, and control the point of handing over the pile as soon as possible, and protect the pile position. Timely review of control points, the survey results in written form to the Engineer (see table wire inspection results table and review the results).
3.2, according to the construction site encryption control points. The plane control network and the elevation control network which are convenient for construction are set up and reported to the supervision engineer for review and check before they can be used.
3.3 according to the design drawings and technical disclosure, measure the upper and lower line of the excavation edge.
3.4 at least three surveyors are present and certified.
3.5 measuring equipment: 1-2 ordinary level instrument and its supporting level gauge, 1 + 2 class total station instrument and its matched prism, 50 meter steel tape, etc. all measuring equipment must have legal verification certificate.
3.6 measurement requirements: measurement work within the industry calculation and exter
您可能关注的文档
- 万能下联 什么都能对!(Everything can be right!).doc
- 万能XP镜像自己做(Universal XP mirroring itself).doc
- 万能五笔输入法使用技巧(All five skills of input method).doc
- 万能作文开头结尾(The general composition begins at the beginning).doc
- 万能产说会主持稿(Universal product says it will host the draft).doc
- 万能作文开头(The beginning of the universal composition).doc
- 万能作文模式(Universal composition model).doc
- 万能八股(Universal public).doc
- 万能八条详解(All eight details).doc
- 万能五笔使用方法(There are five ways to use it).doc
- 个性差异与素质教育(Personality difference and quality education).doc
- 个股期权考试要点(一级)(Key points of individual stock option (level 1)).doc
- 中 考 数 学 临 场 应 试 策 略(We should try our best in the field of test).doc
- 中世纪2 -详解特技触发条件(Medieval 2 - detail special effects trigger condition).doc
- 中世纪骑士的矛与盾(The medieval knight's contradictions).doc
- 中世纪2 工会建立条件(Medieval 2 unions established conditions).doc
- 中企动力专注中小企业IT服务(Zhongqi power focus on smes IT services).doc
- 中东局势分析(Middle East situation analysis).doc
- 中俄的默契配合 毛主席当年的一句话竟然验证了(The tacit agreement between China and Russia was proved by MAO's words).doc
- 中企动力云平台的个性化信息服务(Chinese enterprise power the personalized information service of cloud platform).doc
文档评论(0)