PECVD试卷(PECVD test technique).docVIP

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PECVD试卷(PECVD test technique)

PECVD试卷(PECVD test technique) 1. The RR system there are two kinds of heating module, respectively ___ __ __ infrared heating and the heating plate heat _____ _____ _____ ______. 2. PECVD is the abbreviation of Plasma, Enhanced, Chemical, Vapour, and water. PECVD Chinese name is called: plasma enhanced chemical meteorological deposition 3. The RR the nitrogen pressure can ___ _3-6 kg___ ___ ___ _3 cooling water pressure range - 5 pa___ _____. 4. The RR XXL machine USES the microwave power box and the magnetic control head power is ___ __3KW__ _____. 5. Vacuum switch in vacuum is greater than the _____1______ regarded as atmospheric conditions, less than ____0______ considered a vacuum. 6. The RR XXL process cavity and air duct has ____12____ root silane tube ___6_root ammonia pipe. 7 PECVD chemical reactive _ ____SiH4 + NH3 technique -- -- -- -- SixNyHz__________. 8 RR PECVD system technique is made up of which a few cavity __ feed cavity ______, ____ ____ ____, ____ process chamber heating chamber, ____ ____ cooling chamber, __ __________ the discharge chamber. 9 it is not conform to the requirements of the process is by measuring film refractive index _____ _____ __ and reflectivity _____ _____ 10 RR. The time is 96 hours. Now the RR breakrate should be controlled within one thousandth of one thousand. 1. The RR system there are two kinds of heating module, respectively heating ____ and ____ _____ _____ infrared heating plate heat _____ ______. 2. The vacuum requirements of PM process cavity are required to be pumped into ____2. 0 x e-2 mbar ____ can be loaded. 3. The actual alarm message of the card box is _____ transmission block. 4. Pecvd what is the full name of technique consists of plasma enhanced chemical vapor deposition ________________________. 5. Vacuum switch in vacuum is greater than ___1_____ and is considered to be atmospheric, less than ____0____, which is considered to be a vacuum state. 6. The process cavity special gas pipeline has ____12____ r

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档