- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
山地的土方量是如何计算的(How is the land mass calculated)
山地的土方量是如何计算的(How is the land mass calculated)
How is the land mass calculated? The 2010-03-24 10:12 method a: 1, according to certain spacing (square) to measure the original landform elevation, minus the corresponding to these points in the design of the elevation, combined all amount divided by the number of points * plane area = soil. 2, according to certain spacing, the measured profile, calculate the section area, the average spacing length = * profile after the quantity of every area calculation methods are: CAD area measurement method, planimeter method, grid method, average height method, cut and complement, and so on method 2: to make to compute the stereo, or made surface, surface domain after the query. I recommend a free legal procedures, with earthwork calculation software, download address: /dispbbs.asp? BoardID = 7 ID = 929 and the calculation of earthwork in EXCEL is a common problem in engineering design. Such as channel design, levee design, reservoir dam design, etc., need to calculate the soil quantity accurately. The calculation of earthwork is an important part of these engineering designs, and it is also the most important and cumbersome process in its design. The amount of soil is directly related to the project cost, so it must be accurate and practical. The general engineering soil quantity mainly includes excavation, filling and so on. In accordance with the requirements for the accuracy of construction design, general along its profile every 50 m (or 25 m, specific numerical accuracy according to different design requirements and decide) a earthwork quantity calculation (including excavation, fill, etc.). For a channel of more than 10 kilometers or even dozens of kilometers, the calculation of this method is undoubtedly very heavy. In particular, one section of a section USES hand to calculate, not only the workload is big, and the error is big, the work efficiency is extremely low. Isnt there a way to calculate the small and efficient w
您可能关注的文档
- 剧本试音词(libretto).doc
- 办公室居室清除烟味.doc
- 加密和密码学的毕业论文(Dissertation on encryption and cryptography).doc
- 功能梯度材料及其在太阳能电池中的应用(Functional gradient materials and their applications in solar cells).doc
- 加工中心G代码详解(The processing center G code is detailed).doc
- 加里曼丹岛(Kalimantan island).doc
- 动员机制与现代化建设(Mobilization mechanism and modernization construction).doc
- 动漫名台词(中日对照)(Animation name (Chinese and Japanese)).doc
- 动漫经典对白txt(中日文对照)(Animation classic dialogue TXT (Chinese and Japanese)).doc
- 动漫里经典到让人窒息的话(The classic in animation is to make a person suffocate words).doc
- 嵌入式SQL与动态SQL语句(Embedded SQL and dynamic SQL statements).doc
- 川大2014春《建筑材料》第一次作业答案(The answer to the first homework of building materials in spring 2014).doc
- 工业安装工程施工质量验收统一要求(Uniform requirements for the construction quality of industrial installation works).doc
- 嵌入式网络控制器(Embedded network controller).doc
- 川大《建筑结构设计(ⅰ)1412》13春在线作业1(Sichuan grand architecture design (I) 1412, 13 spring online job 1).doc
- 工人酒后装空管理调坠亡工伤认定成焦点 获赔22万元(The workers' compensation for the fall of the injured workers was found to be 220,000 yuan).doc
- 工作日记(Work diary).doc
- 工厂工配电(Factory distribution).doc
- 工具快捷键(含3DMAX)(Tool shortcut key (including 3DMAX)).doc
- 山大2012化工原理大纲(The Alexander 2012 principles of chemical engineering).doc
文档评论(0)