- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
机车运用与规章(Locomotive operation and regulation)
机车运用与规章(Locomotive operation and regulation)
Application and regulation of electric locomotive
The 1. passenger locomotive overhaul; 150 - 2 million km, repair 40 - 500 thousand km, 100 thousand km and 8 minor repairs
2. repair machine and small transportation overhaul; not less than 15 years, in the repair of not less than 3 years, minor repairs not less than 6 months, in less than 1 months
3.. The locomotive is responsible for the revolving section of the transportation task, which is called the locomotive routing
The 4. locomotive operation system; shoulder back working system, circulation system, circulation system, semi annular transport system, Xun returned transformation
The 5. locomotive crew system; take the wheel, pack system, wheel bag combined system.
6. crew; the class system and off system, immediate exhumation system, midway in shifts and two in shifts, with the ride system.
7. locomotive running kilometers = walking kilometers along the line + conversion kilometers = = this machine runs kilometers + auxiliary machines walk kilometers
8. locomotive turnaround time t, full =t brigade +a+b (a for reentry depot stop time, B reentry section station residence time)
9. speed = this is machine kilometrages / the service machine running time =L/t; travel speed = this is machine kilometrages / the machine service travel time =L/ (t +t stop); travel speed / velocity coefficient velocity was closer to 1 speed closer.
10. railway traffic signal is the instruction of train operation and shunting operation, and the traffic personnel must strictly carry out.
11. railway signals are divided into two categories: auditory and visual signals
12., close, stop, the shutoff signal display distance not less than 1000m, (in the terrain influence sight under worst-case conditions is not less than 200m. High column exit and high column route signaling shall be no less than 800m. The auxiliary signal of hump and hump is not less than 400m. Shunting, low type exit, short route,
您可能关注的文档
- 理论力学问题的答案.doc
- 理论考试综合.doc
- 瓦楞纸箱普通盒型.doc
- 理论电化学课 3.ppt
- 瓦特改进蒸汽机.ppt
- 瑞盈机电电动门窗 4.ppt
- 理论力学课程计划版本 2.doc
- 现场控制现场安装标准.ppt
- 理论力学工作簿和答案.doc
- 珍惜生命学习自我保护.ppt
- 机电工程系(Department of mechanical and electrical engineering).doc
- 李健严格落实规章标准 发挥系统安全效能 稳步推进民航持续安全发展(Li Jian strict implementation of regulations and standards, to play system security effectiveness, steadily promote the sustained and secure development of Civil Aviation).doc
- 机油与温度(Oil and temperature).doc
- 李义山诗歌(Li Yishan Poetry).doc
- 机械设计专用术语英语(Terminology for mechanical design English).doc
- 李小平劳动力大量潜在过剩下的所谓民工荒(Li Xiaoping the labor shortage caused by a large number of potential surplus labor force).doc
- 机械课程设计(Mechanical curriculum design).doc
- 李宗仁的第三任夫人胡友松(Li Zongren's third wife, Hu Yousong).doc
- 李强-《赢销为王》(Li Qiang - winning for sale is king).doc
- 李强 为自己工作 经典语录(Li Qiang works classics for himself).doc
文档评论(0)