- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公路路基施工需注意的几个问题(Several problems needing attention in highway subgrade construction)
公路路基施工需注意的几个问题(Several problems needing attention in highway subgrade construction)
Abstract: the management problems in roadbed construction are the builders have been to explore and to solve the problem, how to ensure the construction quality of subgrade engineering, accelerate progress, improve economic efficiency, according to years of construction management experience, that need a good grasp of several key links.
Key words: subgrade; construction; quality control
As the foundation of the road, the roadbed plays an important role in the highway engineering. Because it is the engineering design and the original blueprint for geological and geomorphological directly with the natural environment, the influence of many factors, difficult construction, and construction period is longer, the project cost accounting for the proportion of the total cost is relatively small, so the economic efficiency of subgrade construction is relatively poor. Following the authors construction experience, the construction of highway subgrade should pay attention to several issues discussed.
I. construction preparation stage
The subgrade construction preparation stage is subgrade engineering construction master plan, survey scope of work, hydrogeological and engineering quantity, making construction plan, construction schedule and schedule preparation before the start of the personnel, machinery, materials and other aspects of the stage, the stage ready or not is the key link is directly related to whether the normal construction of the subgrade engineering therefore, we must seriously and do the following work.
1., detailed investigation, formulate plans
The project is located along the road to a detailed survey (including subgrade soil) and soil source operations within the scope of the liquid limit, plastic limit, plasticity index and water content, strength test standard compaction test and soil (CBR value), making construction method. According to the hydrogeological conditions,
您可能关注的文档
- 云南艺术学院学生食堂二楼餐厅服务管理目标责任人招聘书doc(Yunnan Arts University student canteen two floor restaurant service management target person responsible for recruitment doc).doc
- 云安全技术(Cloud security technology).doc
- 云南企业(Yunnan Enterprises).doc
- 云计算在局域网中应用设想(Application of cloud computing in LAN).doc
- 云阳中学2011届高三月考(Yunyang middle school 2011 senior three monthly exam).doc
- 云计算(cloud computing).doc
- 互相交换名片礼仪(Exchange business card etiquette).doc
- 云计算龙头(Cloud computing leader).doc
- 互联网产品梳理心得(Internet products comb experience).doc
- 五.建筑隔声技术(Five. Building sound insulation technology).doc
- 公交车(Bus).doc
- 六个为什么之五充满活力的基本经济制度(Six why five a vibrant basic economic system).doc
- 公路造价(Highway cost).doc
- 六年级作文基础知识(Six grade writing basic knowledge).doc
- 六种国内德语考试全介绍(Six domestic German examinations are introduced).doc
- 六种macd两曲线金叉买入法(Six MACD two curve MACD buying method).doc
- 兰大《管理经济学》13春在线作业2(Lan Da, management economics, 13 spring online homework, 2).doc
- 六经辨证的理论定义(The definition of the theory of six meridians).doc
- 兰大《工程项目管理》13春在线作业3(Lan Da, project management 13 spring online homework 3).doc
- 兰大《组织行为学》13春在线作业3(Lan Da organizational behavior 13 spring online homework 3).doc
原创力文档


文档评论(0)