冶炼工厂车间个人工作总结及计划(Summary and plan of individual work in smelting plant).docVIP

冶炼工厂车间个人工作总结及计划(Summary and plan of individual work in smelting plant).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
冶炼工厂车间个人工作总结及计划(Summary and plan of individual work in smelting plant)

冶炼工厂车间个人工作总结及计划(Summary and plan of individual work in smelting plant) In the first half of the year, when I was the director of the maintenance workshop, I was mainly responsible for the overall management of the workshop. I focus on maintenance quality and maintenance results, to improve the operating cycle of equipment. Based on the equipment and equipment charter PIRR model implementation; and strengthen the maintenance section and professional inspection coordination, on-site inspection and other means of production as ways to master the running state of the equipment, the inherent problems about the equipment operation, so as to guide I can timely solve the equipment operation difficult, an antidote against the disease, the performance of recovery equipment, effectively improve the utilization rate of equipment, realize the operation rate is greater than 99.02%, the fault rate is less than 0.68% grades. In the process of equipment management, I begin with personnel management, raise the sense of responsibility, improve the management level of personnel to contract equipment, and mobilize the equipment personnel to work on the equipment maintenance work. And the implementation of equipment three levels of inspection and maintenance management system, so that the key equipment, key maintenance, key equipment, key checks. For the basic management of equipment, I always included in the management, the key point of the improvement, by improving and perfecting the basic software of equipment, personnel and equipment to guide and guide system can according to the standard, according to the system, according to the process, strengthen equipment maintenance, improve equipment operation level. According to the upgrading of the companys production capacity, equipment operation for the first time to meet the three furnaces, three machines, full load production model, to achieve the equipment support capacity exceeded 280 thousand tons per month, Nissan nearly 10 thousand

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档