- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
园林工程投标的施工组织设计(Construction organization design of garden project bidding)
园林工程投标的施工组织设计(Construction organization design of garden project bidding)
Construction organization design
I. Basic Survey of the project
Project name:
Engineering location:
Quality standards are required:
Requested date:
Engineering scope:
Construction unit:
Two, construction site plan
Construction (as per design drawing)
Three, construction organization and labor force arrangement
Construction organization
Chief engineer: Shen
Project manager:
Builder:
Worker equipment
Specialty green chemical industry:
Ordinary workers (Engineering, carpentry and bricklaying):
Preparation before construction
3.0.1 afforestation project before construction to do all the preparatory work to ensure the smooth progress of the project. Preparations include: Mastering data, familiar with design, site investigation, planning, budgeting, material supply and site preparation.
Before 3.0.2 starts, grasp the relevant information of the project, such as land use procedures, instructions from higher authorities, sources of investment in the project, engineering requirements, etc..
3.0.3 before construction, familiar with the design guidelines, design intentions, drawings, quality, artistic requirements, and design personnel to the construction unit for design disclosure.
3.0.4 scene, construction personnel to understand the design intention and organize relevant personnel to the scene, the scene generally include: the surrounding environment, construction conditions, power supply, water source, soil source, transportation, piling site, temporary living place, and on the basis of municipal, telecommunications should cooperate with the departments and designated actinomycetes.
Before the start of the 3.0.5 project, formulate the construction plan (construction organization design), including the following contents:
A) the general situation of the project: the quantity of the project, the quantity of the project, the characteristics of the project, the advantages and disadvantages of the project
您可能关注的文档
- 三级服务标准(Three level service standard).doc
- 七月十五烧纸钱风俗(In July fifteen the custom of burning paper money).doc
- 三基试题名词解释(Three questions Glossary).doc
- 三轮推进,稳扎稳打,知能并重,争创辉煌(Three forward, steady, knowledge of both, create brilliant).doc
- 三角函数_8-47(Trigonometric function _8-47).doc
- 上市遇挫急缺钱 太古220亿变卖资产(Swire listed setback so short of money selling assets 22 billion).doc
- 七年级地理下册复习要点(Grade seven geography book review points).doc
- 上财03考研西经试题与答案(Under 03 PubMed West through questions and answers).doc
- 上海(Shanghai).doc
- 专业压限器的使用技巧(Professional pressure limiter using skills).doc
- 2025年中山市沙溪镇人民政府所属事业单位招聘11人笔试备考题库及参考答案详解一套.docx
- 2025年中山市横栏镇人民政府所属事业单位第二期招聘笔试高频难、易错点备考题库及参考答案详解一套.docx
- 2025年中山市横栏镇人民政府所属事业单位第二期招聘笔试高频难、易错点备考题库含答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试高频难、易错点备考题库及完整答案详解1套.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试高频难、易错点备考题库参考答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库附答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试高频难、易错点备考题库附答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库附答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库及答案详解一套.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库及完整答案详解1套.docx
文档评论(0)