业主(住户)入住前筹备工作(Preparatory work for resident (resident) prior to occupancy).docVIP

业主(住户)入住前筹备工作(Preparatory work for resident (resident) prior to occupancy).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
业主(住户)入住前筹备工作(Preparatory work for resident (resident) prior to occupancy)

业主(住户)入住前筹备工作(Preparatory work for resident (resident) prior to occupancy) Preparatory work for resident (resident) prior to occupancy Preparatory work for resident (resident) prior to occupancy Note: 1) completion acceptance time: one to three months prior to the occupancy of the building; 2) check in time: resident occupancy time; The 1 building management office: 1) completed three months before the approval, the company appointed director of the management office, the housing 2 people (Collection 1) in place,. Management office new construction team; other personnel according to the progress of work needs, Cai take step by step approach, the owners (residents) when they check in, all types of personnel in the management office must be in place. 2) management of all types of personnel may be in accordance with the following procedures and time in place, but should be based on District conditions and the actual situation The following (50 thousand) square metres of residential area shall be drawn up ] Three former A. in June, appointed director of the management office, the housing 2 people (Collection 1) put in place, before the Preparation work; B. two months before the final acceptance, the building fire center staff on duty 3 people (1 Electromechanical, water supply and drainage 1 people, Elevator 1 Site personnel, with the electrical and mechanical installation, maintenance, engineering staff, participate in mechanical and electrical equipment installation and commissioning supervision Grasp the basic conditions and operating procedures of building facilities; C. half a month before the completion of acceptance, electrician 2 people, 1 people to the drainage, access to the scene, familiar with the building structure, public match Set of facilities and equipment, to participate in the completion of acceptance, with the legacy of the housing building project supervision and rectification work. D. half a month before the completion of acceptance, some security

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档