- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
八钢2500m3高炉生产实践(Production practice of 2500m3 blast furnace in Bayi Steel)
八钢2500m3高炉生产实践(Production practice of 2500m3 blast furnace in Bayi Steel)
Eight 2500m3 blast furnace production practice of Zhou Hongjun Li Gangyi 1 in Baosteel Group Xinjiang Steel Company blast furnace branch A blast furnace operation area Urumqi 830022
From the initial blast furnace blast furnace design characteristics, production technology, raw materials and special gas flow adjustment technology of 2500m3 in A at the blast furnace production practice was summarized detailed analysis of the situation now A blast furnace raw fuel system summary A blast furnace furnace furnace for more than two years
The countermeasures taken according to the situation swap at the actual situation summarizes the fluctuation in the coke quality equipment stability Hugh non process air rate high reason
Countermeasures of A blast furnace. And constructive put forward the future direction of development of 2500m3 blast furnace in Bayi steel.
Keywords blast furnace ironmaking; raw gas flow; production practice; Production; Practices; of; 2500m3; in; Blast; Furnace;
Bagang Iron and Steel Co. Zhou Hongjun Li Gangyi in Baosteel Group Bagang Co., Ltd. BF Branch, Urumchi Abstract According to the 830022, the BF design Characteristics, adjust gas flow production technology raw and fuel material
Special condition in BF, raw and fuel material special condition act summarize practise of A BF put into production in
2500m3 BF labor raw and fuel material condition summarize Countermeasures of A BF put into production for two years.
According to BF Condition coke quality equipment instability BF blow-down percentage by equipment act to table a
Proposal, development, direction, for, A, BF, was, optimize,, operations, in, BF.
Key words BF design characteristics raw and, fuel material, gas flow, production technology 2007 original Xinjiang Bayi Iron and Steel Co. Ltd. in the driving wheel of history after joined Baosteel Group Co. less than two years
In the new Weiranchuli a new. In February 28, 200
您可能关注的文档
- 绘世界建筑手绘设计课程表(Drawing a world hand painting curriculum).doc
- 自动化专业英语第三课翻译(Third courses in English for automation).doc
- 自动化学校考研科目(Automation school entrance examination).doc
- 自动化设计(Automation design).doc
- 自动挡汽车档位介绍(Introduction of automatic gear shift).doc
- 脑白金暴利不再 四通控股亏损1.42亿(Melatonin profits no longer holding four loss 142 million).doc
- 自动挡汽车档位简介(Automatic gear profile).doc
- 自动档档位的详细介绍(Automatic gear detail).doc
- 自动检测技术 1绪论(Automatic inspection technology 1 Introduction).doc
- 自动档驾驶(Automatic driving).doc
- 2010-2023历年福建省福州外国语学校高一上学期期中考试政治试卷(带解析).docx
- 2024年中国上水石市场调查研究报告.docx
- 2010-2023历年福建省上杭一中高二第二学期半期考试数学(理科)试题.docx
- 2024年塑料导轮项目可行性研究报告.docx
- 2024年中国直螺纹钢筋丝头市场调查研究报告.docx
- 2010-2023历年福建泉州九中高三阶段考试政治试卷(带解析).docx
- 2024年电子变压器专用绝缘树脂项目可行性研究报告.docx
- 2024年2—甲基—3—硝基苯甲酸项目可行性研究报告.docx
- 2024年中国无线手压式开关市场调查研究报告.docx
- 2010-2023历年福建省厦门一中高二上学期期中考试化学试卷(带解析).docx
文档评论(0)