- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地下室渗漏的原因及其抗渗漏处理措施(Causes of leakage in basement and anti seepage measures)
地下室渗漏的原因及其抗渗漏处理措施(Causes of leakage in basement and anti seepage measures)
Causes of leakage in basement and anti seepage measures
0 Introduction
With the development of urban construction, more and more high-rise and super high-rise buildings have been built, and underground garage and underground building are also increasing. The leakage of basement is quite common, and it has become one of the common problems of quality. Especially the underground water level is high, and the soft soil foundation, construction design, the uneven settlement of concrete cracks, vibration, ramming the less dense produce leakage phenomenon is also quite common leakage plugging cost is quite high, serious and even affect the use function.
1 causes of leakage
1.1 design reasons
1.1.1 deformation joint setting unreasonable according to the specification, the maximum deformation of the reinforced concrete structure wall spacing regulations of 20-45m, but in practice often will enlarge the scope of 1-2 times, even without leaving the post pouring belt, but also do not take other measures, although brought to the construction of convenient, but also to keep the leakage hidden danger.
1.1.2 design of reinforcement reinforcement due to unreasonable design is unreasonable, the constraint effect on concrete shrinkage reducing, with production and temperature deformation, stress concentration, make the concrete crack and leakage problems left behind.
1.2 construction reasons
1.2.1 deformation joint setting is improper. According to the design requirements, the deformation joint shall be set, such as the post pouring joint, which usually needs to be constructed by 40-60d. Extended construction period, if the grass-roots cleaning or pouring bad, will leave leakage hidden; as another settlement joints, usually to the main building after the cap can be built, such a longer construction period; if improper construction will also leave hidden dangers. Construction defects of uneven construction joint
您可能关注的文档
- 压力管道试压条件确认表(Verification form for pressure test condition of pressure pipe).doc
- 厦门大学海洋与环境学院学生素质综合测评条例(Regulations for comprehensive assessment of students' quality in College of marine and Environment Sciences, Xiamen University).doc
- 厦门市市场中介机构管理办法(Measures for the administration of market intermediaries in Xiamen).doc
- 厦门酒吧招聘-面试中求职者必须面对的问题(Xiamen bar Recruitment - questions that applicants must face during an interview).doc
- 厦门(Xiamen).doc
- 去甲醛十大植物高手(Go to formaldehyde ten big plant master).doc
- 去除房间异味(Remove room odor).doc
- 去除身体寒湿的方法,很管用的(Method of removing body cold, very useful).doc
- 县乡财政困难及其对财政支农能力的影响(上)(The financial difficulties of county and township and its influence on the ability of financial support for agriculture (Part one)).doc
- 县供销社2012年重点工作和一季度开门红工作方案(County supply and marketing cooperatives in 2012 key work and a good start in the first quarter of the work program).doc
文档评论(0)