- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
压力管道试压条件确认表(Verification form for pressure test condition of pressure pipe)
压力管道试压条件确认表(Verification form for pressure test condition of pressure pipe)
Pressure condition confirmation form.Txt Ming Sao easy to hide the test pressure pipeline, dark base to prevent. Buddha said: you two are silly, B!! The sun was born when the night was turned on the bed again, and this was contributed by Zhou Youxi
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
SH3503SH3503J407
Piping installation inspection and pressure test records
Check content
Project Name: Engineering Name: Unit Name: unit name:
Examination result
The pipe component is installed correctly, valves, flange, gasket, bolt support and hanger is installed correctly installed in the correct weld weld appearance inspection work record complete nondestructive testing qualified heat treatment component marking clear safety valve, qualified alloy steel plate and blasting instrument components have been removed or separated with blind identification of pressure pipeline design of pressure welding (MPa) test pressure test medium strength (MPa) pressure tightness test (MPa) results
Design temperature (DEG C)
Construction / supervision unit professional engineer: Technical Director: quality inspector: class (Group): long, day, month, day
Shi
Work unit
Specific date
SH/T3503-J4061
Confirmation of pressure test condition for piping system
Low voltage system I check items and requirements system number
Project Name: Yanchang Petroleum Group Xinghua energy saving and comprehensive utilization project of unit name: air separation unit (271) 1 C- low voltage examination results are consistent with the requirements to meet the requirements to meet the requirements to meet the requirements, meet the requirements to meet the requirements to meet the requirements to meet the requirements to meet the requirements to meet the requirements of
System name
Pipeline installation conforms to the design documents an
您可能关注的文档
- 华为、美能达的绩效考核秘诀(HUAWEI, Minolta performance tips).doc
- 华南植物,不全(Southern China plant, incomplete).doc
- 华南师大外文学院真题(Southern China Normal College of foreign languages.).doc
- 华佗五禽图健身法练习要领(Hua Tuo five bird figure fitness method exercise Essentials).doc
- 华南理工大学2012考研复试分数线公布(South China University of Technology 2012 postgraduate entrance examination retest scores announced).doc
- 华帝减利润 不要怪奥运(Don't blame the Olympics for Vatti's profit margins).doc
- 华附初中趣味数学题(China Junior High School Math interest).doc
- 华立集团对标胜任素质模型开发领导力(HOLLEY group benchmarking competency model development leadership).doc
- 单位发放实物福利的财税处理(Fiscal and taxation treatment of unit offering physical benefits).doc
- 卓越团队训练(Team training excellence).doc
最近下载
- 项目的实施流程.pdf VIP
- 2024年6月8日浙江杭州市直遴选笔试真题及答案解析.doc VIP
- 新人教版初中数学九年级上册《第二十三章旋转:23.1图形的旋转》公开课教案_4.pdf
- invt英威腾chf100a变频器使用说明书.doc
- 《生物化学课程标准.doc VIP
- 2023年黑龙江大学法学专业《民法学》期末试卷A(有答案).docx VIP
- GB_T 20001.3-2015 标准编写规则 第3部分:分类标准(OCR).pdf VIP
- 开放式和针阀式热流道比较.ppt
- 义务教育版(2024)三年级全一册第6课《视频记录片段》课件.pptx VIP
- 重庆市XX住宅工程分户验收表格填写样例.docx
文档评论(0)