建筑基础放线(Building foundation laying).doc

建筑基础放线(Building foundation laying).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑基础放线(Building foundation laying)

建筑基础放线(Building foundation laying) 2010 laying out the most complete building foundation lofting How to release the foundation of raft foundation It can be said that the field construction experience of laying off: 1, first of all, the main axis (horizontal and vertical control lines), and then according to the structure of the design of underground interior walls, columns, shear walls, columns, beams (beams, plates, rafts), the elevator foundation, post pouring zone location, and so on. 2, in which walls, columns, shear walls, column lines should be painted with color paint, usually red paint in the wall column corner to do triangle mark, in order to facilitate raft plate reinforcement, wall column reinforcement main place, placed. It should be noted that after the completion of the basic line, to self inspection, mutual inspection, and finally with the supervision and acceptance of the joint, to confirm the error before the beginning of reinforcement banding construction. The main axis should be placed in the construction, so that it is much easier to put the wall column. Mainly for the walls, columns and other details of the location of the correction, because the details tend to occur minor errors. After the completion of the line is to do the foundation line recording and other engineering information. How to lay off the civil foundation? Trench excavation and excavation leveling line line 1. line line trench excavation in the foundation excavation, in accordance with the basic details on trench width and upper slope size, from the center to both sides of the pile were excavating sideline size, and mark; and then pull a thin line between mark trench ends, along the lines in the the ground with lime and a trench line, construction on this gray line excavation. The 2. excavation leveling in order to control the excavation depth, excavation near the bottom when, in the trench wall from the corner began, is provided with a groove bottom than to raise the level of d

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档