建筑安全(Building safety)

建筑安全(Building safety) Building safety.Txt Establishment of safety technical measures in construction plan The construction plan (or design) is the guiding principle for the specific action of the construction, and its safety technical measures are an important part of the construction plan. As emphasized in the engineering construction must be made before the safety technical measures, the provisions of the Ministry of Construction issued in early 1983 state-owned enterprise work safety regulations: all of the construction project construction organization design (or construction plan) must have the safety technical measures. Construction law thirty-eighth provisions are more specific: construction enterprises in the preparation of construction organization design, should be based on the characteristics of construction projects to develop corresponding safety technical measures.. Because each project from start to completion of the whole process, there are many unsafe factors and hidden danger, if unforeseen, poor safety management measures, will affect the construction progress and benefits, and even cause personal accidents. In order to ensure the safety in the construction process, we must through pre analysis, so as to better control, eliminate the hidden dangers in the construction process, eliminate hazards, and ensure the smooth progress of construction. 1. requirements for construction program staff The personnel construction plan is the construction process of the designer, must establish a safety first, from the beginning of construction drawings must seriously consider security issues, not for construction and operation personnel to stay hidden as much as possible. Staff should fully grasp the general situation of the project, construction period, site environmental conditions, according to the structure features of the project, the scientific selection of construction methods, construction machinery, power distribution facilities and temporary power line

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档