- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电梯试题(Elevator examination questions)
电梯试题(Elevator examination questions)
(A)
Two, the multiple-choice questions (1 points per game, 35 points)
1, elevator operation can not use the normal control mode, so that the lift stops running, called elevator operation A.
A, out of control B, normal C, slow D, overspeed
3, there is one symbol manipulation box, A button.
A, close B, open the door, C, uplink, D, downlink
5, fire electrical equipment when the fire, the use of C fire.
A, water, B, sediment, C, hydraulic oil, D and carbon dioxide powder extinguishing agent
7. While waiting for the goods to be loaded, the passengers will be standing at D.
A, car top B, hall entrance C, car and hall door D, outside the door area
9, the car beyond the flat position, A cm, do not jump out of the car.
A, + 60 B, + 10 C, + 20 D, + 100
10 which of the following equipment does not belong to the special equipment D.
A, elevator B, in house motor vehicle C, passenger ropeway D, central air conditioning
11, the elevator in the process of abnormal parking, trapped people, is a D state.
A, normal B, overhaul C, danger D, protection
12 the main power line of the elevator requires zero line ground separation which should be understood as C and always separated.
A, zero line neutral line B, zero line protection line PE C, neutral line protection line PE, D, neutral line, N phase line
13, elevator routine maintenance rules, the standard provides elevator routine maintenance work, secondary, on-site operation shall not be less than
B people.
A, 1 B, 2 C, 3 D, 4
14, elevator rated speed refers to: C.
A, motor rated speed B, installation and commissioning personnel set the speed of the car
C, the elevator design specifies the speed of the car D, the highest speed of the elevator fluke
15, in general, to meet the current national requirements of intercom devices should be C sets.
A, 3 B, 4 C, 5 D, 6
16. When adjusting the balance coefficient of the elevator, how much should be placed on the heavy block should be determined according to
您可能关注的文档
- 词规则(Word rule).doc
- 话题作文素材大全之为人处世话题---自信(Topic composition material is the topic of conversation --- confidence).doc
- 话题作文道德素材(Topic composition morality material).doc
- 询问笔录(transcript of questioning).doc
- 该怎样保护自己(How to protect yourself).doc
- 详细介绍汽车轮胎知识与介绍(Detailed knowledge and introduction of automobile tire).doc
- 详细的三国十酒馆各种复杂任务(Detailed Ten Kingdoms, various complex tasks of the tavern).doc
- 详细的内存大小识别方法(Detailed memory size identification method).doc
- 详细的家居装修流程(Detailed process of home decoration).doc
- 详解5险1金、3险1金(Explain 5 risks, 1 gold, 3 risks, 1 gold).doc
- 电梯销售(Elevator sales).doc
- 电气工程师申报资格(Qualification of Electrical Engineer).doc
- 电气故障排除的方法与要领(Methods and essentials of electrical troubleshooting).doc
- 电气考研专业课(Electrical examination postgraduate course).doc
- 电池企业如何做好发展战略规划(How to develop a strategic plan for battery enterprises).doc
- 电流互感器的二次侧在工作时决不允许开路(The two side of the current transformer must not be allowed to open while operating).doc
- 电源供电不足的六种故障(Six faults with insufficient power supply).doc
- 电源的工作原理(The working principle of power supply).doc
- 电气自动化考研学校及科目(Electrical automation graduate school and subjects).doc
- 电线截面积的确定(Determination of sectional area of electric wire).doc
文档评论(0)