- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
监理资料收集(Collection of supervision information)
监理资料收集(Collection of supervision information)
Data collection method for engineering construction
In order to ensure the unity, integrity and operability of the construction materials, the construction materials for the construction phase of the Ramada Plaza Hotel project are specially formulated as follows:
I. contract documents: construction contract documents, supervision contract documents and purchase contract documents
Two, enterprise qualification:
1. the qualification information of the general contractor (enterprise license, qualification certificate, legal person certificate, fee taking certificate).
2. full-time management certificate: Project Manager, materials, quality inspection, records, safety, statistics, measurement, contract, mechanical management, budget, construction staff (Civil Engineering, hydropower)
3. Special Engineering Certificate: electrician, welder (butt welding, vertical welding, etc.) tower crane operation, tower crane command, lifting command, test worker.
Qualification information of 4. subcontracting units [enterprise license, qualification certificate, legal person certificate, construction permit of special industry, foreign project (contracting abroad), engineering license, all kinds of qualification certificate and work permit in China.].
5. qualification information of supplier (business license, product qualification certificate, record certificate, production license, product safety certificate).
6. laboratory qualification information and submission of witness authorization.
Three 、 construction organization design:
1. overall construction organization design and review submissions.
2. construction organization design and review opinions.
3. other special construction scheme and examination opinions.
Four, start / return to trial:
1. start / return report and report form.
2. suspension of works order.
3. 、 time limit report and approval.
Five 、 engineering survey:
1. engineering positioning survey records.
2. axis elevati
您可能关注的文档
- 汪永江先生大篆临摹课教学纲要1(Mr. Wang Yongjiang Zhuan copying Teaching Outline 1).doc
- 沂蒙故事(Yimeng story).doc
- 沃尔玛验厂最新清单(The latest list of Woermayan factory).doc
- 沃尔玛经营行为与消费者行为与心理分析(WAL-MART's business behavior and consumer behavior and psychological analysis).doc
- 沟通方法与技巧(Communication methods and techniques).doc
- 沪教版高三化学模拟题2007宝山区(附答案)(Chemistry model 2007, senior middle school of Shanghai Education Edition, Baoshan District (with answers)).doc
- 河北省气象影视现状分析及集约化模式探讨(Analysis of meteorological film and TV in Hebei province and discussion of intensive model).doc
- 河南产品质量安全检验检测技术机构建设规划》-中国特种设备检验网(Henan product safety and safety inspection and inspection technical organization construction plan - China special equipment inspection network).doc
- 河南全新节能软启动产品 驭风而行,机灵无比(Henan new energy saving products with soft start line, great spirit).doc
- 河南省395管理家企业试水年金制(Henan 395 management enterprise test the water annuity system).doc
原创力文档


文档评论(0)