1. Defining Design-Build. - defectlaw(1。).pdf

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1. Defining Design-Build. - defectlaw(1。)

1. Defining Design-Build. In a design-build process, both the design and construction of a project are performed by a single entity. This differs significantly from the traditional design-bid-build process, in which an architect or engineer is selected by the owner to design the project, and competitive bids are taken from other entities for the performance of construction services. Consulting Engineers and Land Surveyors of California v. Dept of Transportation (2008) 167 Cal. App. 4th 1457, 1462, 84 Cal. Rptr. 3d 900. Typically, under the traditional design-bid-build system, the owner warrants the correctness of the plans and specifications to the construction contractor under the Spearin Doctrine, United States v Spearin (1918) 248 U.S. 132, 137, 63 L. Ed. 166, 39 S. Ct. 59, applied in California by Souza McCue Constr. Co. v. Superior Court (1962) 57 Cal. 2d 508, 511, 20 Cal. Rptr. 634, 370 P.2d 338. A design professional does not warrant the sufficiency of the plans and specifications furnished to the owner, unless there is an express warranty agreement that the design professional assumes responsibility for the accuracy of the plans. Allied Properties v. John A. Blume Associates (1972) 25 Cal. App. 3d 848, 855-856, 102 Cal. Rptr. 259; Gagne v. Bertran (1954) 43 Cal. 2d 481, 487, 275 P. 2d 15. Accordingly, a contractor who has followed plans, specifications or directions provided by the owner, or one acting on behalf of the owner, traditionally cannot be held liable for alleged construction defects or insufficiencies attributable to the plans. McConnell v. Corona City Water Co . (1906) 149 Cal. 60, 64. In contrast, design-builders assume the responsibilities of a design professional (architect/engineer) and furnish all services – designing, engineering, constructing – necessary to deliver a completed project for an agreed price. Thomas v. Buttress McClellan, Inc. (1956) 141 Cal. App. 2d 812, 815. A desi

您可能关注的文档

文档评论(0)

hhuiws1482 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档