A PROGRAM MANUFACTURING COST (一个项目制造成本)
A PROGRAM
for
MANUFACTURING COST ESTIMATING
of
SHEET METAL STAMPING and FORMING
(Sample C)
The program presented here is limited to estimating the manufacturing cost of sheet metal stamp-
ing and forming. With the entry of certain data (to be defined) the application of this program
will yield the cost of material, labor, burden and scrap The sum of these factors is considered to
be manufacturing cost
We should state here that the system being presented is based on Asset Center Costing (ACC).
This costing technique is akin to Activity Based Costing but may best be explained by compar-
ing it with the traditional Labor Base Distribution (LBD) technique. Using the LBD method,
hourly burden costs are determined by collecting all shop burden costs for some period of time,
then dividing this total by the number of direct labor hours accumulated in that period of time.
The quotient is the burden rate per direct labor hour. This burden rate does not discriminate be-
tween the cost of a simple bench operation and the cost of a complex CNC machine, in spite of
the obvious discrepant burden costs. The LBD method will charge the burden rate for a given
piece of equipment for as many times as there are operators on that operation. If there are two
operators, the burden is charged twice, if there are three operators the burden is tripled. This
simple presentation easily illustrates the potential inequality of LBD costing. The ACC method
accounts for the specific burden costs associated with a given piece of equipment. The cost
charged to the part being costed is only for the time that a given operation takes in that equip-
ment. Labor costs are calculated independently. Machine burden is only charged once. The
ACC meth
您可能关注的文档
- A GENERAL GUIDE TO THE PRINCIPLES, 04 (一般的指导原则,04年).pdf
- A G r e a t A m e r i c a n S t e e l C o m p a n y(一个G r e t m e r i c n S t e e l c o m p n y).pdf
- A Generic Camera Model and Calibration (一个通用的摄像机模型和校正).pdf
- A Generative CAPP system for sheet (生成CAPP系统表).pdf
- A GPS controlled frequency standard - VHF Comm(GPS控制频率标准甚高频通信).pdf
- A generalised solution for generating stepper (一个普遍的解决方案产生步进).pdf
- A Great New Way to Set Your Side Mirrors - Car (一个伟大的新方法来设置你的一面镜子汽车).pdf
- A Guide for Atomic Force Microscopy Analysis of (原子力显微镜分析的指导).pdf
- A GUIDE FOR DEVELOPERS - (开发人员指南-).pdf
- A Guide to BUILDING MAINTENANCE and REPAIR(指导建筑维护和修理).pdf
- 山东省威海乳山市银滩高级中学2022-2023学年高三9月月考物理试题.docx
- 山东省日照第一中学2020届高三上学期期中考试英语试题 Word版含答案.doc
- 山东省实验中学2023届高三第二次诊断考试语文试题.docx
- 山东省威海乳山市银滩高级中学2023届高三上学期9月月考日语试题 word版无答案.docx
- 山东省实验中学2023届高三第二次诊断考试地理试题.docx
- 山西省运城市2022-2023学年高三年级入学新生教学质量监测考试地理试题.docx
- 山东省实验中学2023届高三第二次诊断考试历史试题.docx
- 山东省实验中学2019届高三第二次诊断性考试数学试题(文).doc
- 山东省济南市历城第二中学2020届高三上学期期中考试化学试题 Word版含答案.doc
- 山东省威海乳山市银滩高级中学2022-2023学年高三9月月考政治试题.docx
文档评论(0)