A PROGRAM MANUFACTURING COST (一个项目制造成本).pdf

A PROGRAM MANUFACTURING COST (一个项目制造成本).pdf

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
A PROGRAM MANUFACTURING COST (一个项目制造成本)

A PROGRAM for MANUFACTURING COST ESTIMATING of SHEET METAL STAMPING and FORMING (Sample C) The program presented here is limited to estimating the manufacturing cost of sheet metal stamp- ing and forming. With the entry of certain data (to be defined) the application of this program will yield the cost of material, labor, burden and scrap The sum of these factors is considered to be manufacturing cost We should state here that the system being presented is based on Asset Center Costing (ACC). This costing technique is akin to Activity Based Costing but may best be explained by compar- ing it with the traditional Labor Base Distribution (LBD) technique. Using the LBD method, hourly burden costs are determined by collecting all shop burden costs for some period of time, then dividing this total by the number of direct labor hours accumulated in that period of time. The quotient is the burden rate per direct labor hour. This burden rate does not discriminate be- tween the cost of a simple bench operation and the cost of a complex CNC machine, in spite of the obvious discrepant burden costs. The LBD method will charge the burden rate for a given piece of equipment for as many times as there are operators on that operation. If there are two operators, the burden is charged twice, if there are three operators the burden is tripled. This simple presentation easily illustrates the potential inequality of LBD costing. The ACC method accounts for the specific burden costs associated with a given piece of equipment. The cost charged to the part being costed is only for the time that a given operation takes in that equip- ment. Labor costs are calculated independently. Machine burden is only charged once. The ACC meth

您可能关注的文档

文档评论(0)

hhuiws1482 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档