FIDIC Particular Conditions of Contract(FIDIC特定条件的合同)
FIDIC Particular Conditions of Contract
FIDIC Plant and Design-Build Contract
MDB Harmonised Particular Conditions
1. Introduction
There is a need for FIDIC to provide sample Particular Conditions that render the General Conditions of
the 1st Edition 1999 of the FIDIC Plant and Design-Build Contract compatible with the Multilateral
Development Bank (MDB) Harmonised Edition of the FIDIC Construction Contract.
“FIDIC MBD” means the FIDIC “Conditions of Contract for Building and Engineering Works Designed by
the Employer – Multilateral Development Bank Harmonised Edition – March 2006”. It is abbreviated as
MDB.
“FIDIC Design-Build” means the FIDIC “Conditions of Contract for Plant and Design-Build for Electrical
and Mechanical Plant, and for Building and Engineering Works, Designed by the Contractor - First Edition
1999”. It is abbreviated as FDB.
The sample Particular Conditions are offered as a service to industry on a best-effort basis. The suggested
Particular Conditions have not been reviewed, commented on or approved by the Participating Banks that
have licensed the use of the FIDIC Construction Contract for the MDB Harmonised Edition.
These proposed Particular Conditions of Contract modify the FIDIC MDB Harmonised Construction
Contract (March 2006 version) from design by the Employer (with remeasurement) to design by the
Contractor (with lump-sum payment).
2. Notes
Generally and unless the context otherwise requires, the provisions of the FIDIC Plant and Design-Build
Contract, 1st Edition 1999, have been incorporated without alteration. However there are some cases where
this has not been applied and these are detailed in Section 3 below.
The Harmonised Construction Contract has been taken as the basic document. Any sub-clauses relating to
design, payment and measurement have, where considered appropriate, been included in the Particular
Conditions as amendments to the FIDIC MDB Harmonised Construction Contract. This also involves
dele
您可能关注的文档
- Exercise and Physical Activity for Older Adults(运动对老年人和身体活动).pdf
- EXHIBIT A ROYALTY AGREEMENT Name of (展览的版税协议名称).pdf
- Executive Summary Functional Safety in (执行概要功能安全).pdf
- EXHAUST SYSTEMS - Defender(排气系统后卫).pdf
- EXHIBITOR PROSPECTUS 2015 Offshore (参展商招股说明书2015海外).pdf
- Exide produktblad Gel 2011 ENG(2011 ENG Exide produktblad凝胶).pdf
- Expanding the capabilities and use of Automatic ...(扩展的功能和使用自动).pptx
- EXECUTION VERSION SHARE PURCHASE (执行版本分享购买).pdf
- Experience with Safety Integrity Level (SIL) (安全完整性水平经验)).pdf
- EXPERIENCE THE MOST HEROIC ADVENTURE OF (最英勇的探险经验).pdf
文档评论(0)