施工现场临时用电安全方案(Temporary power safety plan for construction site) Temporary power safety plan for construction site I. General Survey 1, this project is Changchun city wide residential building project of 4#, total construction area of 47956 square meters mm. The underground 2 storey frame (9436 square meters), on the ground 18 floor frame. 2. The structure system is frame supported shear wall structure. The seismic grade of the strengthening part of the bottom of the shear wall is two, the seismic grade of the non strengthening part at the bottom is three, and the anti-seismic grade of the fram