屋面找平层施工工艺(1002-1996)(Construction technology of roof leveling layer (1002-1996)).docVIP

屋面找平层施工工艺(1002-1996)(Construction technology of roof leveling layer (1002-1996)).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
屋面找平层施工工艺(1002-1996)(Construction technology of roof leveling layer (1002-1996)) 2.1 materials and requirements: 2.1.1 the quality and technical performance of the material must comply with the design requirements and specifications of construction and acceptance specifications. 2.1.2 cement mortar: 2.1.2.1 cement: Ordinary portland cement, no less than 325. 2.1.2.2 sand: should use medium sand, mud content is not more than 3%, excluding organic impurities, grading should be good. 2.1.3 asphalt mortar: 2.1.3.1 asphalt is made of Road No. 60, No. 60, road asphalt, or no. 75 common asphalt. 2.1.3.2 sand: medium sand, mud content is not greater than 3%, excluding organic impurities. 2.1.3.3 powder: can use slag, shale powder, talc and so on. 2.2 main machines and tools: 2.2.1 machines: mortar mixers or concrete mixers. 2.2.2 tools: material transport trolley, shovel, iron trowel, horizontal scraping bars, horizontal ruler, asphalt pot, fried dish, press roll and iron. 2.3 operating conditions: 2.3.1 leveling layer before construction, the roof insulation layer should be checked and accepted, and for acceptance procedures. 2.3.2 all through the roof of the embedded pipe, chimney, gutter wall, parapet, roots and other joints, according to drawings and specification requirements of design and construction process. 2.3.3 according to the requirements of design, elevation, slope, find the rules and play the line (including the gutter and eaves slope). The construction of 2.3.4 leveling layer should be the original clean surface, processing, is conducive to the combination of the base and the leveling layer, such as water, spraying and other asphalt. 3.1 process: Grass roots cleaning, pipe root sealing, elevation, gradient, elastic line, watering and wetting Construction leveling layer (cement mortar and asphalt sand leveling layer) 3.2, grass-roots cleaning: the structure layer, insulation layer on the surface of loose debris clean, and protruding base surface ash and other

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档