新建施工(New construction).docVIP

  • 1
  • 0
  • 约 6页
  • 2017-08-03 发布于河南
  • 举报
新建施工(New construction) Two the fixed spacing shall ensure that the cable can bear the load, and its maximum arc spacing (floor) shall not be less than 2.50m. (3) temporary distribution main line on the construction site, if the overhead laying, must use insulated copper (aluminum) line, erect in the special line pole (frame), forbid to erect in the tree or other easy to cause the electric wire breakage or the electrically conductive object. (4) the concrete pole rod or pole. There shall be no concrete pole reinforcement, crack; wood decay, not distorted, its tip diameter not less than 13cm. (5) in accordance with the requirements of mechanical strength of conductor, insulated copper wire section of not less than 2 10mm Dang stirring; insulating aluminum is not less than 16mm Dang 2. Crossing the railway, the main road, navigable river, insulation line across the span of overhead power line wire: minimum section of not less than 16mm; aluminum is not less than 2. 35mm Dang multi wire. Spanning height: overhead line, cross rail, rail and road, maximum arc sag shall be no less than 6m. (6) the temporary line erection of the site shall be clearly defined and the time limit shall be removed immediately after the expiration of the project. (7) temporary power supply of high-rise building must be introduced by cable buried pipe. The vertically laid cables shall be protected by steel bushing with the vertical shafts and vertical holes used in the works, and shall be as close as possible to the load center of the power load, and shall not be less than one point on each floor. Horizontal laying shall be fixed along the wall, and shall be no less than 1.8m from the floor level From: security management network () details: /Tech/Build/201101/166993_3.shtml Construction safety measures Construction safety measures Organization measures for safety management 1., establish security responsibility system, and implement the responsible person. Security is a series of activities to p

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档