新建施工(New construction)
Two the fixed spacing shall ensure that the cable can bear the load, and its maximum arc spacing (floor) shall not be less than 2.50m.
(3) temporary distribution main line on the construction site, if the overhead laying, must use insulated copper (aluminum) line, erect in the special line pole (frame), forbid to erect in the tree or other easy to cause the electric wire breakage or the electrically conductive object.
(4) the concrete pole rod or pole. There shall be no concrete pole reinforcement, crack; wood decay, not distorted, its tip diameter not less than 13cm.
(5) in accordance with the requirements of mechanical strength of conductor, insulated copper wire section of not less than 2 10mm Dang stirring; insulating aluminum is not less than 16mm Dang 2. Crossing the railway, the main road, navigable river, insulation line across the span of overhead power line wire: minimum section of not less than 16mm; aluminum is not less than 2. 35mm Dang multi wire. Spanning height: overhead line, cross rail, rail and road, maximum arc sag shall be no less than 6m.
(6) the temporary line erection of the site shall be clearly defined and the time limit shall be removed immediately after the expiration of the project.
(7) temporary power supply of high-rise building must be introduced by cable buried pipe. The vertically laid cables shall be protected by steel bushing with the vertical shafts and vertical holes used in the works, and shall be as close as possible to the load center of the power load, and shall not be less than one point on each floor. Horizontal laying shall be fixed along the wall, and shall be no less than 1.8m from the floor level
From: security management network () details: /Tech/Build/201101/166993_3.shtml
Construction safety measures
Construction safety measures
Organization measures for safety management
1., establish security responsibility system, and implement the responsible person. Security is a series of activities to p
您可能关注的文档
- 数码印刷设备提供售后全包服务利弊并存(Digital printing equipment to provide after-sales total package service pros and cons).doc
- 数字集成电路CD4511(Digital integrated circuit CD4511).doc
- 数字录像机磁头的保养与维护(Maintenance and maintenance of head for digital video recorder).doc
- 数字媒体对文化传播的演进与重构(The evolution and reconstruction of digital media to cultural communication).doc
- 数字医院系统口述操作流程(Oral operation process of digital hospital system).doc
- 数字音视频高级考工练习题(答案)1.0(Digital audio and video advanced examination exercises (answers) 1).doc
- 数字音视频高级考工练习题(答案)10(Digital audio and video advanced examination exercises (answers) 10).doc
- 数学转专业(Mathematics transfer major).doc
- 撕裂冲最(Tearing punch).doc
- 搜索一石激起千层浪门户决战渠道(Search one stone arouses thousands of waves portal decisive battle channel).doc
- 广东省广州省实验中学教育集团2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州大学附属中学2025-2026学年八年级上学期奥班期中物理试题(解析版).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(含答案).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(解析版).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 2026《中国人寿上海分公司营销员培训体系优化研究》18000字.docx
- 《生物探究性实验教学》中小学教师资格模拟试题.docx
原创力文档

文档评论(0)