煤气作业人员复习题(Review questions for gas operators)
A. Completion
1. When gas is fired, steam or nitrogen shall be introduced into the equipment, but the gas pressure shall not be less than (100) PA.
2. Natural measures, such as sulfur removal, must be taken when the equipment and piping of the gas system, such as gas, press, desulfurization, purification or storage are switched on.
3. the static distance between gas pipeline and high voltage line is below 1KV (1.5), 1kV - 20kV (3.o) meters.
4., the discharge of residual gas should be higher than the surrounding buildings, generally less than (30) meters away from the ground
5. with the gas operation should not be carried out at night, should not (in a thunderstorm), gas station personnel protection work should be supervised, the operator should wear or ventilation (mask) or (air respirator).
6., from the gas operating point outside 10m, you can install the projector.
7. when coke oven is being used in the basement to block the blind plate, no gas operation shall be carried out. The steam should be cleaned in advance and kept under the state of positive pressure.
8., valve and fan valve should not be used alone, should be located behind the butterfly valve or gate valve.
9. pressure ignition method is divided into two units and isolation method.
10. gas pipeline gas replacement device operation is divided into air displacement, steam replacement, flue gas replacement, direct displacement and nitrogen displacement.
11. the operation of blind block with gas is a dangerous operation. In order to ensure safety, the application should be made to the safety department or gas station before operation, which can be carried out after approval.
12., the discharge pipe should be higher than the gas pipeline, equipment and 4 meters away from the ground, not less than 10 meters.
13. in addition to the special provisions, any gas facilities shall maintain positive pressure operation.
14., before the gas has been baking furnace, its fur
您可能关注的文档
- 完工验收2(Completion acceptance 2).doc
- 完全解读Web 2_0(完全解读Web 2_0).doc
- 完全卸载Apple(完全卸载苹果).doc
- 完善干部平时考核办法- 中国日报网(Measures for improving cadres' assessment at ordinary times - China Daily).doc
- 完善企业内部会计控制的对策(Countermeasures for perfecting internal accounting control of enterprises).doc
- 完形填空常用动词(Cloze Test verbs).doc
- 完型常用词汇(Common vocabulary).doc
- 完整的VISml(Full VISml).doc
- 完整的毕业设计任务书(示例)(Complete graduation design task (sample)).doc
- 完整的过柱经验总结(Complete column experience summary).doc
原创力文档

文档评论(0)