无砟轨道机械施工技术(Construction technology of untrackless track).docVIP

无砟轨道机械施工技术(Construction technology of untrackless track).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
无砟轨道机械施工技术(Construction technology of untrackless track) Construction technology of Zublin no - track mechanical construction Time: 2010-09-24 browsing time: 469 Abstract: as the first introduction of the xuploplin model without a track system in zhengzhou ~ xi an railway passenger line, the advantages are that the orbital precision is high, and the geometrical size can be sustained - Abstract: xu spring type without a frantic jumble rail system in zhengzhou - xi an railway passenger dedicated line in China was first introduced, the advantage is of high precision orbit, after forming can persistently keep track geometry size, the replacement of damaged without a frantic jumble orbit is more convenient. The construction technology of concrete road bed board is the key point of the construction of the joplin. The mechanical construction method has high requirements for measuring technology, which has advantages of convenient operation, fast speed, high precision and obvious social benefit. Key words: joplin, no track; The base; Isolation layer; The bed board; The construction technology 1. Overview of the untrackable track in joplin The joplin system is developed by joplin construction corporation in 1974 and is laid on a hard concrete base. It is characterized by the filling of the bed plate concrete first, then the double block type sleeper is installed in place, and the sleeper is inserted into the compacted concrete through the vibration method until it reaches the precise position of [1]. On a bridge without a frantic jumble rail due to the lower structure strong, no bending moment, at the same time protected by waterproof layer and layer of reinforced concrete bridge panel, so the bridge xu spring without a frantic jumble orbit design into two layers: the lower and concrete cover permanent connection, top and sleeper or directly connects with rail fastener. The two layers of concrete are separated by artificial rubber or asphalt soil, and the longitudinal force

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档