路基调研(Subgrade research)
Basic engineering accident investigation report
civil
102
Case a
Project overview
Beijing baisheng building phase ii project, deep foundation pit
15
The diameter of reinforced concrete filling pile is made of pile anchor support
800 mm
Pile top elevation
-
3.0 m
The pile top is made of concrete and concrete beams
3 m
High retaining brick wall, and
Reinforced concrete structure column. Under the ring beam
2 m.
Place a layer of bolt, with steel waist girder to fix the bolt, actually the bolt length
20 m.
Angle,
15
C to
18
The anchor is the steel strand.
The geological con
您可能关注的文档
- 销售就是一场战争(Sales is a war).doc
- 鞋样造型设计的表现形式、表现技法与实用性价值鞋样设计学校(The form of shoe shape design, performance technique and practical value shoe design school).doc
- 项目前期接管(Pre-project takeover).doc
- 雪佛兰故障案例分析(四)(Chevrolet failure case analysis (4)).doc
- 雪莲功效(Snow lotus effect).doc
- 雪茄盒的使用方法(The use of cigar boxes).doc
- 雅虎中国天气代码一览表(Yahoo China weather code list).doc
- 野鸡育雏期的饲养管理(Breeding and management of wild chickens).doc
- 野鲫鱼钓法(Crucian carp fishing).doc
- 野外求生秘笈(Survival tips in the wild).doc
最近下载
- 《年产10亿刺五加片生产工艺和车间初步设计》-毕业论文.doc VIP
- 2026中国半导体ALD设备行业未来趋势与需求前景预测报告.docx
- 计算机软件源代码授权合同.docx
- 电阻电感RL积分_微分实验电路及仿真_吕伟锋.pdf VIP
- 第一单元第1节+从互联到物联 课件+2025-2026学年川教版(2024)初中信息科技八年级上册.pptx VIP
- 举报信范文范文.docx VIP
- 素养导向的单元重构:初中数学二次根式复习课的教学设计与实施.docx VIP
- 高速公路桥梁常见病害成因及预防措施.doc VIP
- 公路收费及监控员考试培训试卷(2025).docx VIP
- 阳关三叠F调正谱伴奏原调伴奏谱.pdf VIP
原创力文档

文档评论(0)