设备预算复习题(4)(Equipment budget review (4)) 1. The water supply and drainage system consists of several parts (introduce the pipe), (dry pipe), and (riser) water supply accessories. 2. The laying methods of the indoor water supply pipeline are divided into two types (lay laying) and (dark laying). 3. The installation engineering quantity of the pipe can be calculated according to the working medium class and the flow direction, first underground, after the ground, (the main line) (the branch line) in the order (also can be determined according to the installation location). 4. Disinfection of the