- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
运行与维护1(Operation and maintenance 1)
Environmental protection equipment operation and overhaul
9.1 basic provisions
9.1.1 before the desulfurization tower internal repair work, should be connected to the desulfurization tower of limestone slurry feed pipe, gypsum slurry discharge slurry outlet pipe, accident, accident of flue entrance/exit of the slurry into the tube, the valve or baffle door locked and unlocked, hang up the notice board. The electric valve should also cut off the motor and put a warning sign on. Stop of the desulfurization tower fan blower fan, slurry circulating pump, oxidation, flue gas heat exchanger (GGH), desulfurization tower mixer equipment such as running, and the equipment the power cut off, and put up warning signs.
9.1.2 before the desulphurization absorption tower is fired, the responsible person shall check the fire water system in the corresponding area and the water system in addition to the mist. It is strictly forbidden to do fire operation in the absorber unless the water system is not ready. During the fire, a professional guardian is set up in the operation area and the absorption tower.
9.1.3 staff, denitration facilities, desulfurization facilities into all kinds of filter before the repair work, must be corresponding boiler induced-draft fan, to the powder machine, the machine, blower, the power of the rotary air preheater, cut off, and hang up the start warning card is prohibited.
9.1.4 on boiler operation of bag filter for the maintenance of individual gas chamber, must will repair the bag filter corresponding flue gas chamber of import and export baffle door closed, and cut off the damper power, and put up warning signs.
9.1.5 into electrical precipitator, bag filter, denitration reactor overhaul, to adequate ventilation cooling, dust collector temperature should be below 40 ℃, otherwise no entry for repair work. If you must enter more than 40 ℃ of the dust collector for a short period of time at work, a specific safety mea
您可能关注的文档
- 车言车语(Car speak language).doc
- 车载导航电子地图(In-car navigation electronic map).doc
- 车主vs油耗子 悉数货车防偷油的9大绝招(Car owner vs oil mouse the 9 great tips for stealing oil from trucks).doc
- 车辙成型机(Rutting machine).doc
- 诚信服务品牌 做好区域开拓(Good faith service brand to build up the region).doc
- 词汇哈哈镜趣记考研英语词汇(12)(Vocabulary fun to study English vocabulary (12)).doc
- 词汇一些容易出错的词汇(Vocabulary some words that are easy to go wrong).doc
- 词库大全(3)(Lexicon (3)).doc
- 词曲牌名(CiQuPai name).doc
- 达人解释(Talent explains).doc
- 深度解析(2026)《GBT 19532-2018 包装材料 气相防锈塑料薄膜》.pptx
- 深度解析(2026)《GBT 22152-2008国际货运代理业务统计导则》.pptx
- 深度解析(2026)《GBT 22153-2008国际货运代理通用交易条件》.pptx
- 深度解析(2026)《GBT 22157-2018声学 测量道路车辆和轮胎噪声的试验车道技术规范》.pptx
- 深度解析(2026)《GBT 22159.3-2008声学与振动 弹性元件振动 声传递特性实验室测量方法 第3部分:弹性支撑件平动动刚度的间接测量方法》.pptx
- 深度解析(2026)《GBT 22162-2008盘装和架装工业过程测量和控制仪表的盘面和开孔尺寸》.pptx
- 深度解析(2026)《GBT 22181.5-2015等离子体显示器件 第5部分:总规范》.pptx
- 深度解析(2026)《GBT 22181.6-2015等离子体显示器件 第6部分:数字电视机用等离子体显示器件空白详细规范》.pptx
- 深度解析(2026)《GBT 22181.1-2008等离子体显示器件 第1部分 术语与文字符号》.pptx
- 深度解析(2026)《GBT 22225-2008化学品危险性评价通则》.pptx
最近下载
- 内浮顶罐安全管理规范.pdf VIP
- 最新子宫颈高级别上皮内病变管理的中国专家共识2022(完整版).pdf VIP
- 2025年建筑工程副高面试题及答案.docx VIP
- 2023年嘉兴学院计算机科学与技术专业《计算机网络》科目期末试卷B(有答案).docx VIP
- 四川省德阳市2023-2024学年高一下学期教学质量监测 化学试卷含答案.docx VIP
- 流量积算仪瞬时流量不确定度评定与流量理论值的误差分析.pdf
- CASS编码、图层、图块名称、属性对照表.pdf VIP
- 2023年浙江万里学院计算机科学与技术专业《计算机网络》科目期末试卷A(有答案).docx VIP
- 《中国药典》2020年版 二部 注射用水.pdf VIP
- 沈阳建筑大学《计算机网络》2025 学年第二学期期末试卷.pdf VIP
原创力文档


文档评论(0)