运行与维护1(Operation and maintenance 1).docVIP

运行与维护1(Operation and maintenance 1).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
运行与维护1(Operation and maintenance 1) Environmental protection equipment operation and overhaul 9.1 basic provisions 9.1.1 before the desulfurization tower internal repair work, should be connected to the desulfurization tower of limestone slurry feed pipe, gypsum slurry discharge slurry outlet pipe, accident, accident of flue entrance/exit of the slurry into the tube, the valve or baffle door locked and unlocked, hang up the notice board. The electric valve should also cut off the motor and put a warning sign on. Stop of the desulfurization tower fan blower fan, slurry circulating pump, oxidation, flue gas heat exchanger (GGH), desulfurization tower mixer equipment such as running, and the equipment the power cut off, and put up warning signs. 9.1.2 before the desulphurization absorption tower is fired, the responsible person shall check the fire water system in the corresponding area and the water system in addition to the mist. It is strictly forbidden to do fire operation in the absorber unless the water system is not ready. During the fire, a professional guardian is set up in the operation area and the absorption tower. 9.1.3 staff, denitration facilities, desulfurization facilities into all kinds of filter before the repair work, must be corresponding boiler induced-draft fan, to the powder machine, the machine, blower, the power of the rotary air preheater, cut off, and hang up the start warning card is prohibited. 9.1.4 on boiler operation of bag filter for the maintenance of individual gas chamber, must will repair the bag filter corresponding flue gas chamber of import and export baffle door closed, and cut off the damper power, and put up warning signs. 9.1.5 into electrical precipitator, bag filter, denitration reactor overhaul, to adequate ventilation cooling, dust collector temperature should be below 40 ℃, otherwise no entry for repair work. If you must enter more than 40 ℃ of the dust collector for a short period of time at work, a specific safety mea

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档