大桥施工(The bridge construction).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大桥施工(The bridge construction) The bridge construction This section has a bridge 1, namely, the rock creek bridge, the central pile number K110 + 268, for the span of 30 meters of T beam structure, the bridge is 156 meters long. The upper part of the bridge is a continuous stress t-shaped beam after the first branch, and the lower part is the foundation girder, the cylinder, the frame beam, the ribbed plate and the bored pile foundation. Number of works: 60 pieces of T beams, 32 pile foundations, 12 beams and 16 columns. The drilling data shows that the soil under the riverbed is sandy soil and gravel soil, and bedrock is weakly weathered shale. Set the bento bridge on the left side of the line. Main project construction time schedule 1 January 2003 solstice 1 April 2004. (1) construction of bored cast-in-place pile The bridge has 32 bored piles, 180cm in diameter and 120cm in diameter, all of which are rock-socketed piles. The plan was completed on March 10, 2003. According to the geological condition of the bridge in this section, the drilling equipment of bored piles is used to drill the drilling equipment, and the individual shorter bored piles can be used for rotary drill (with the cone bit). The concrete is used to carry concrete, concrete conveying truck and concrete, and the concrete is filled with pipe. In order to avoid contamination of river channels, set up mud pools, mud discharge enters the mud pool, and then reuse, after the pile foundation is completed, excavate the mud and replace the river stone. Drilling pouring concrete construction procedures for buried steel liners to drilling emplacement, rushed into the (hole) to the first hole cleaning, the reinforcing cage and concrete under the catheter to the second hole cleaning, pouring underwater concrete pile to chisel in addition to the pile head, pile foundation inspection. The construction process is shown in figure 5-3 of the construction process flow chart 1. The pile location is measured and the

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档