网站大量收购独家精品文档,联系QQ:2885784924

大型工程群塔施工作业的布置与管理(Layout and management of construction work of large engineering group towers).doc

大型工程群塔施工作业的布置与管理(Layout and management of construction work of large engineering group towers).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型工程群塔施工作业的布置与管理(Layout and management of construction work of large engineering group towers) Layout and management of construction work of large engineering group towers In large engineering construction work, often need to decorate more even more than ten sets of tower crane (hereinafter referred to as the tower crane) homework at the same time, the selection of reasonable arrangement to give full play to the ability of each tower crane, otherwise not only lower the efficiency, and even cause an accident. Therefore, it is necessary to arrange and reduce blind area and strengthen the management of the system. Beijing Henderson center project is set star-rated hotels, apartments, office buildings, shopping malls, shopping, restaurants, fitness, underground garage for the integration of large public buildings, 109 m wide from east to west, north and south 275.36 m long, covers an area of 30000 m2, building area of 310000 m2, general contracting by Beijing construction group. Construction area is made up of three civil engineering companies, respectively set up three projects, intends to points north, the Middle East area, south central, southern district, the scene after many negotiations, reasonable placement for 9 sets of arms long 50 ~ 70 m tower crane. Beijing Oriental plaza is located between wangfujing street and dongshan street in the north side of east changan street of Beijing, and the north is in the concord hospital, and the wangfujing street is adjacent to the Beijing hotel. The project covers an area of 110,000 m2, with a building area of 940,000 m2, with a base area of 96,000 m2, and the deepest excavation depth of 25m. It is the largest comprehensive civil building in China. Building only by 13 (plate) tower building, an underground substation, which returned from the east to the west respectively, east north (40000 m2), 220 kv substation (10000 m2), west returned underground floor, south commercial office buildings, apartments, the five-star hotel as

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档