西交《发电厂电气部分(高起专)》在线作业(West to power plant electrical parts (higher) online operation).doc

西交《发电厂电气部分(高起专)》在线作业(West to power plant electrical parts (higher) online operation).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西交《发电厂电气部分(高起专)》在线作业(West to power plant electrical parts (higher) online operation) West to power plant electrical parts (higher) online operation Total score: 100 test time: - Radio examination A multiple-choice question Judgment question Radio examination questions (20 questions, 40 points) 1. the shape factor Kf in the formula of three-phase electrodynamic force is determined by () Mechanical strength of A. conductors The shape of a B. conductor Layout position of C. conductor Shape and relative position of D. conductor Full marks: 2 2., the choice of distribution equipment, usually to determine the technical and economic comparison, the general () voltage level should be used inside the power distribution device. A., 35kV and below B., 35kV and above C., 10kV and above D., 110kV and below Full marks: 2 3. in power system, shunt reactor is mainly used () A. limits short-circuit current at fault Capacitive reactive power in B. absorbing power grid C. provides capacitive reactive power to the system Full marks: 2 4. thermal power plant using the generator transformer unit, auxiliary working power generator by connecting with the factory, branch line adopts isolated phase enclosed bus, a branch line should be the correct equipment or other facilities described in () A. shall be equipped with circuit breakers The B. shall be provided with disconnecting switches and shall not be fitted with circuit breakers C. shall be equipped with removable points The D. shall not be equipped with any equipment or facilities Full marks: 2 5. three-phase three column voltage transformers can be used to measure () A. line voltage B. phase voltage C. zero sequence voltage D. negative sequence voltage Full marks: 2 6. the phase operation of the generator will lead to () A. static stability reduction B. static stability improved C. had no effect D. is not sure Full marks: 2 The 7. () connection will interrupt the circuit power supply when the outlet breaker is checked and repaired. A. s

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档