- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国高速铁路建设规划1(China high-speed railway construction plan 1)
Chinas high-speed railway construction planning:
1. The four horizontal and four longitudinal high-speed railway passenger network skeleton planned for construction is:
1.1 four vertical passenger special line
(1) Beijing -- Shanghai: the total length is about 1,318 kilometers, and the two major economic zones of the bohai and Yangtze river delta are connected to the four provinces of beijing-tianjin and hebei.
(2) Beijing -- wuhan -- guangzhou -- shenzhen: it has a total length of 2,260 kilometers and connects north China, central China and southern China.
(3) Beijing - shenyang - Harbin (dalian) : the total length is about 1,700 kilometers, connecting northeast and guanzhong area. Qinhuangdao - shenyang was completed in 2003.
(4) hangzhou -- ningbo, fuzhou -- shenzhen: it is about 1,600 kilometers long, connecting the Yangtze river, the pearl river delta and the southeast coastal areas.
1.2 four horizontal passenger special line
(1) xuzhou, zhengzhou - lanzhou: the total length is about 1400 kilometers, connecting northwest and east China.
(2) hangzhou, nanchang - changsha: the total length is about 880 km, connecting central and eastern China.
(3) Qingdao -- shijiazhuang -- taiyuan: it is about 770 km long and connects north and east China.
(4) nanjing -- wuhan -- chongqing -- chengdu (ninghan rong) : the total length is about 1,600 kilometers, connecting the southwest and east China.
1.3 several key sections of the passenger line
It was introduced from the nanchang hub of the railway, and the total length of the railway is about 560 kilometers, from fuzhou in jiangxi province to putian in putian (fuzhou). The railway will form a new and shorter route from the Midwest to the southeast coast. There are also jiujiang nanchang, hainan east ring, nanjing hangzhou, nanjing anqing, cheng-cotton, changchun jilin and other railway lines.
1.4 intercity rail transit
Intercity rail transit in the Yangtze river delta,
您可能关注的文档
- 仓储单选(Warehousing radio).doc
- 仓库管理制度(Warehouse management system).doc
- 产品的跟踪物料(Product tracking materials).doc
- 产品介绍(Product introduction).doc
- 产品美学(Product aesthetics).doc
- 产品评估(Product evaluation).doc
- 产品示范(Product demonstration).doc
- 串口并口PCI 接口总结(Serial interface and PCI interface summary).doc
- 串行实时时钟芯片DS1302程序设计中的问题与对策(Problems and countermeasures of serial real-time clock chip DS1302 program design).doc
- 串口连接线制作方法(Method of serial connection).doc
- 中国行政管理史 论文(Chinese administration history paper).doc
- 中巴建能源走廊(China-pakistan energy corridor).doc
- 中国酒商之变(The change of Chinese wine merchants).doc
- 中国科学院院士籍贯地市排行榜(Academician of Chinese academy of sciences).doc
- 中国联通广州营业厅(China unicom guangzhou office).doc
- 中国美术史答案(Answer to Chinese art history).doc
- 中国民族民间舞等级考级教材(Chinese folk dance grade examination textbook).doc
- 中国诗词名句大全 需要不断更新(China's poetry and famous sentences need to be constantly updated).doc
- 中国石油北京《宏观经济学》第三次在线作业(China's oil capital, macroeconomics, the third time online).doc
- 中国矿业大学教务处(China mining university academic affairs office).doc
文档评论(0)