- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电机大修(Motor overhaul)
5.1 overhaul preparatory work before
Check the motor vibration, current and temperature, the bearing should sound 5.1.1 overhaul before, according to the inspection and preventive test records and maintenance records for overhaul and repair projects plan.
5.1.2 organization learning process and maintenance personnel maintenance measures and matters needing attention, and technical disclosure, clear division of labor.
5.1.3 in accordance with the equipment, materials and maintenance records must be ready to overhaul overhaul project, the lifting tool careful examination, when necessary, pull test.
5.1.4 according to the electrical safety regulations for the work ticket formalities, do on-site safety measures and safety tests.
The disintegration of 5.2 motor
The disintegration of the 5.2.1 motor, should be based on the specific structure of each motor and the field maintenance condition and ensure the correct implementation of security, lifting large motor should be heavy with
5.2.2 large motor disintegration of conventional steps
5.2.2.1 open the cable head, cable head three-phase short-circuit grounding, protect and support.
5.2.2.2 remove the motor of anchor bolts and screws, the wheel shell grounding and cooling device etc..
5.2.2.3 to remove the wheel.
5.2.2.4 first open end cover cover, non load bearing, and then split the load side end cover, bearing cap.
5.2.2.5 the installation of special tools, out of the rotor.
The conventional method of 5.2.3 pump rotor:
5.2.3.1 small motor direct extraction by manual.
5.2.3.2 driving hook connected false axis pump.
5.2.3.3 in the motor seat is fixed on a dedicated rail pump rotor.
5.2.3.4 driving or monorail cantilever tool pump rotor.
5.2.3.5 chain cantilever crane tool and Xiaoping car mobile pump rotor stator.
The quality of the break-up of the 5.2.4 request:
The components and 5.2.4.1 removable anchor spacers should be open to the phase lead mark, mark, and keep the original demolition of the orig
您可能关注的文档
- 绘本故事(Picture book story).doc
- 绘画与时代精神(Painting and the spirit of the times).doc
- 绘图配置文件(Drawing configuration file).doc
- 绘图题(Drawing problem).doc
- 纪念五四运动九十周年大会主持词(Commemoration of the theme of the 54 Movement 90th anniversary congress).doc
- 简爱2(Jane Eyre 2).doc
- 简答、论述题答案(This short answer, answer questions).doc
- 简单的三角形网格生成程序(Simple triangular mesh generator).doc
- 简单的英语单词(Simple English words).doc
- 简单的英语学习方法(Simple English learning methods).doc
最近下载
- 2023年浙江省杭州市临平区小升初科学试卷(含解析).docx VIP
- 《智能控制系统与工程》教案.doc VIP
- 第2课神秘的非洲美术 课件 2025浙美版美术七年级下册.pptx
- 工业管道GC2-记录表卡(2023版精华).doc VIP
- 尾矿库施工组织设计.pdf VIP
- 2024年高考地理二轮热点题型归纳(新高考通用)专题13 气候特征的描述及成因(解析版).docx VIP
- 2025北京经济技术开发区招考社区工作者80人考试备考试题及答案解析.docx VIP
- (最新)理论考试无人机操作员考试题库(网校专用).docx VIP
- 无损检考证测试题.doc VIP
- 安徽省天一大联考2024-2025学年高二下学期5月阶段性检测 英语(含答案).docx VIP
文档评论(0)