- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电力系统自动装置简答(Automatic power system short answer)
1, parallel operation: load random changes in the power system, in order to guarantee the power quality, and meet the requirements of safety and economic operation, often need the generator input and exit operation, take a to be idling generator system after the necessary adjustment, to meet the operating conditions are tied by switching operation and the operation process of this system, called parallel operation.
2, two to start the standby generator with excitation, the generator set up voltage, adjust the voltage and frequency of the generator, and the system voltage and frequency are nearly the same, choose the right time, the generator voltage and the system voltage in phase difference near 0o close and column circuit breaker, will be incorporated into the generator power grid.
Since 3, over the same period: in parallel without excitation, close to synchronous speed generator input system, then add to the generator excitation in the driving torque, synchronous torque generator will be pulled into the synchronization, complete parallel operation.
4, the same period: parallel generator grid conditions. The synchronization point is that the same phase sequence, frequency synchronization, power supply voltage is the same.
5, slip, slip frequency, cycle slip: slip: a tie breaker on both sides of the generator voltage electrical angular velocity and angular velocity of the system voltage difference; slip cycle: the juxtaposition between the two sides of the circuit breaker of generator voltage and the system voltage phase difference changes with 360 degrees of time.
6, the constant phase synchronization: before Ug and Ux two phase coincidence angle constant issue closing signal called the constant phase angle paralleling device.
The whole step, whole step voltage sinusoidal voltage, the voltage linear: automatic parallel device, parallel detection conditions, including voltage synchronization condition information; lin
您可能关注的文档
- 简单的英语学习方法(Simple English learning methods).doc
- 简单介绍photoshop 各工具的作用(Briefly introduces the functions of Photoshop tools).doc
- 简单谈一下惠弘aa360跟up雅柏ex-120的区别(Simple talk about the difference between Hui Hong aa360 with up Albert ex-120).doc
- 简单分页的思想(The idea of simple Pagination).doc
- 简介护患沟通的国内外的区别(Introduce the differences between nurse and patient communication at home and abroad).doc
- 简历不要花里胡哨(Do not resume garish).doc
- 简单经济的除痘方法(Simple and economic method.).doc
- 简历模板(Resume Template).doc
- 简历网站(Resume website).doc
- 简历制作网址大全(Resume production web site Daquan).doc
最近下载
- 标准的个人简历表格[空白].doc VIP
- 开放系统11879《小学语文教学研究》期末机考真题及答案(第102套).docx VIP
- 2025年新教科版科学四年级下册全册知识点(超全版).pdf
- 《sm-3酶标仪说明书》.doc VIP
- 3篇《严禁违规操办“升学宴廉政承诺书》谈话记录.docx VIP
- 2025中国工商银行软件开发中心社会招聘笔试备考题库及答案解析.docx VIP
- 老年常见病的预防与照护教学大纲.docx
- 六年级科学上册(教科版)全册同步练习(含答案).pdf VIP
- 2025年新人教版七年级下册历史全册知识点(新教材).pdf VIP
- 基于项目式学习的初中生物综合实践活动案例论文.docx
文档评论(0)