- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电气设备的保养规程(Maintenance regulations for electrical equipment)
Maintenance procedures for electrical equipment
In the operation of transformer outage or annual maintenance time, stop the transformer increase maintenance time before being put into use.
Maintenance procedures:
(1) maintenance to disconnect the transformer low voltage side of the circuit breaker, isolating switch, pull down, hanging signs corresponding on the handle.
(2) disconnect the load switch transformer high voltage side, confirmed in the open position after the grounding knife switch, and complete the safety insurance and hung signs.
(3) oil into the transformer room, first confirm the transformer is in the state power application of high voltage electroscope, and pull the high-voltage isolation knife, and then check the shell, insulator and lead without deformation, damage should be replaced, the oil level is normal, if there is oil leakage phenomenon, should replace the pad, check whether silicone if effective, discoloration or serious failure, should be replaced immediately.
(4) re fastening lead terminal, pin, grounding screw; screw into the line, such as loose, remove the screw with a thin flat file file light touch interface, without any uneven feel with the hand, with a clean cloth to wipe the dust, wipe Vaseline, replaced with new spring washers fastening screw.
(5) check the surrounding dust removal equipment transformer lighting, heat dissipation, is intact, and the dust on the transformer body and porcelain with a clean cloth wipe.
(6) check the high voltage side of the transformer load switch, ensure the flexible operation, good contact, transmission part lubrication.
(7) 2500V tramegger measuring transformer high voltage coil insulation resistance (phase to ground and meet the requirements, confirm) at room temperature (30 DEG C, the transformer high voltage side 1OKV greater than 20M, the low pressure side of greater than 13M. Before the test, have good grounding wire, determined afte
您可能关注的文档
- 精怪班主任 和调皮鬼过招让90后、00后学生心悦诚服(Demon teacher and mischievous ghost blows to the 90, 00 after convincing students).doc
- 精加工新技术(Fine machining new technology).doc
- 精馏塔开停车步骤(Rectification tower opening and stopping steps).doc
- 精美摘抄,献给每一位有理想的大学生(Exquisite excerpt, for every ideal college).doc
- 精密空调与普通家用空调区别(The difference between precision air conditioner and ordinary home air conditioner).doc
- 精明主妇教你省钱妙招(A smart housewife teaches you how to save money).doc
- 经济顶层设计三核心(Economic top-level design three core).doc
- 精养鱼池的水质与调控技术(Water quality and regulation techniques of fishpond).doc
- 精益生产管理(Lean production management).doc
- 竞技钓比赛规则(2)(Rules of competitive fishing (2)).doc
文档评论(0)