- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
彩钢房安装工序(Color steel housing installation process)
How to do color steel room?
The first step: Foundation Survey
1. Measure the length and width of the foundation with the tool ruler, and verify whether it is consistent with the size of our business personnel;
2. Observe whether the other requirements of the foundation are in accordance with the requirements of our business personnel;
3. If the customer fails to provide the foundation on request, the engineering team can propose to the engineering manager, and the project manager will make timely representations to the relevant departments and personnel.
The second step: release line.
1, on the ground mark according to the requirements of installation position of ink to provide location pop-up geosyncline, the basis for the next installation of geosyncline;
2, the line only needs to put the front wall and the geosyncline line;
3, if it is standard type house, the distance between the front wall and the geosyncline line is 6.26 meters, if the nonstandard type house needs special explanation;
4, the front wall and the geosyncline line are respectively 10 cm along the standard foundation.
The third step: geosyncline iron.
1, the second steps of the operation of the ink, put the geosyncline iron;
2, the outer edge of the ink with iron geosyncline;
3, the expansion tube, the standard type of geosyncline iron each with eight expansion tube, need to play full.
The fourth step: Anping beam.
1. Move a flat beam and the front and rear columns into the proper location of the foundation;
2, the flat beam on both sides of the screw holes are aligned on the front and rear columns, the middle of the Han iron screw hole;
3. Screw the upright post and the flat beam.
Note: screw not less, not.
The fifth step: the support beam, the front and back of the two links.
1. Lift the flat beam and upright column of the fourth steps;
2. Block the column feet into the geosyncline iron, and align the column foot screws with the screw holes on the
您可能关注的文档
- 白话erp企业到底应不应该上erp(Vernacular ERP should the enterprise go to ERP).doc
- 白酒的广告战略(Liquor advertising strategy).doc
- 白居易咏物诗的世俗化色彩(The secular color of Bai Juyi's chanting poetry).doc
- 白菜树脂工艺品制作(Manufacture of Chinese cabbage resin).doc
- 白色污染活动方案(White pollution program).doc
- 白铁皮(Tin plate).doc
- 白细胞(white blood cell).doc
- 白血病分类(Leukemia classification).doc
- 白羽王鸽高产的养殖技术(Breeding techniques of white feather King Pigeon in high yield).doc
- 百大美剧(100 TV).doc
- 难点详解鲁教版(五四制)6年级数学下册期末测试卷带答案详解(考试直接用).docx
- 难点详解鲁教版(五四制)6年级数学下册期末试题【培优】附答案详解.docx
- 难点解析鲁教版(五四制)7年级数学下册期末试题及完整答案详解(全国通用).docx
- 难点解析鲁教版(五四制)7年级数学下册期末试题含完整答案详解(名师系列).docx
- 难点解析鲁教版(五四制)7年级数学下册期末试题含完整答案详解【全国通用】.docx
- 难点解析鲁教版(五四制)7年级数学下册期末试卷(突破训练)附答案详解.docx
- 难点解析鲁教版(五四制)7年级数学下册期末试卷(能力提升)附答案详解.docx
- 难点详解京改版数学9年级上册期中试卷附参考答案详解【突破训练】.docx
- 难点解析鲁教版(五四制)7年级数学下册期末试题含完整答案详解(有一套).docx
- 难点解析鲁教版(五四制)7年级数学下册期末试卷带答案详解(夺分金卷).docx
最近下载
- 减肥打卡社群运营.pdf
- 时间管理之四象限法则的运用PPT(59张)课件.pptx VIP
- Unit 5 Whose dog is it_ Part A Spell 课件人教版英语五年级下册.pptx
- 价值管理的信息系统开发.pptx VIP
- 装饰装修施工组织设计(完整版).pdf
- 模板专项施工方案(完整版).docx
- 《最后一片叶子》课件高教版中职语文基础模块上册.pptx
- 光合速率的测定方法讲课教案.ppt
- 电气控制与可编程控制技术课程设-三相六拍步进电机PLC控制系统的设计.docx VIP
- 2024-2025学年苏科版八年级物理下册 第9章 压强和浮力【速记清单】(解析版).pdf VIP
文档评论(0)