- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浐灞收房须知[1](BA [1] notice Shoufang)
In this paper, by the Changan camel contribution
Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view.
Problems to be clarified, others houses, Shoufang process problems to be clarified? Others, houses, Shoufang process?
Author: jiaaoyanfang submittal date date: 2009-2-20 21:53:00 | classification: | visits: 173 of the brand and others. The brand is the developer to the owners to fulfill their obligations to deliver is the developer to the owners to fulfill delivery obligations, he entrusted property delivered to the owners, can also be, but in fact the property should provide a power of attorney. Otherwise, should by the developers to perform the obligation of delivery in property should provide a power of attorney should perform the obligation of delivery by the developers themselves. But the dispute itself has nothing to do with the owners commission. And the dispute with the owners commissioned independent developers of the brand is a contract for the sale of real estate developers is the contract for the sale of real estate in each other. AP two, room. AP 1, the owners should be within a reasonable period of time that housing must be in accordance with the developers agreed time to the site owner or the housing should be within a reasonable period of time, the developers must according to the agreed time to shoufang. (Lawyer: if not according to notice occupation time to check the room, if not in time to notice in housing industry mainly liability for. The main industry of liability for) which was at 2, no inspection before, we all need to be cautious to sign documents. AP 3, the notice on some to pay by the owners according to their own situation decision. (Law on notice to pay the costs, the owners decided according to their own situation: the owners to pay related fees after the normal payment, still retains the right to recourse.) The brand
您可能关注的文档
- 电脑系统代码(Computer system code).doc
- 电脑硬件组装全过程——主板安装图解(The whole process of computer hardware assembly - motherboard installation diagram).doc
- 电脑知识 (198)(Computer knowledge (198)).doc
- 电脑咨询(Computer consultation).doc
- 电气安全常识讲义a(Lecture notes on electrical safety a).doc
- 电气电控柜安装注意事项(Note the installation of electrical control cabinet).doc
- 电气工程及其自动化简介及其课程(Introduction to electrical engineering and automation and its courses).doc
- 电气工程及其自动化专业英语(English for electrical engineering and automation).doc
- 电脑术语简单学(Computer terminology, simplicity).doc
- 电气工程施工技术措施(正版)(Technical measures for electrical engineering construction (genuine)).doc
文档评论(0)