- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
挤塑聚苯板价格(Extruded polystyrene board prices)
Extruded polystyrene board (exterior insulation):
25 thick (including construction and accessories) 125 yuan /m2
30 thick (including construction and accessories) 132 yuan /m2
40 thick (including construction and accessories) 146 yuan /m2
50 thick (including construction and accessories) 160 yuan /m2
60 thick (including construction and accessories) 174 yuan /m2
Extruded polystyrene board (exterior insulation):
25 thick (including construction and accessories) 95 yuan /m2
30 thick (including construction and accessories) 100 yuan /m2
40 thick (including construction and accessories) 112 yuan /m2
50 thick (including construction and accessories) 124 yuan /m2
60 thick (including construction and accessories) 136 yuan /m2
Calculation of earthwork excavation
(a) calculation of earthwork excavation
The calculation of earthwork excavation, which can be approximately according to column volume calculation (Figure 1 - 8).
Figure 1 - 8 excavation of earthwork calculation in Figure 1 - 9 the foundation pit earthwork calculation
V=H* (A+4A+A) /6
H - the depth of foundation pit (m).
A1, A2 - two on the pit bottom area (M2).
A0 - pit section area (M2).
The calculation of earthwork volume leveling
The four prism method
A, box four corners all dig or fill (1 - 16), the volume of excavation and embankment:
Type: H1, H2, H3, H4, - four square corner dig or fill the construction height, with absolute values (m);
A - grid length (m).
Figure 1 - 16 corner fill or digging; Figure 1 - 17 corner two or two fill dug; Figure 1 - 18 corner in three dig
B, a four corner, partly excavated part is filled when (1 - 17), the volume of excavation and embankment respectively:
C, a three corner excavation, another corner filling time (Figure 1 - 18),
The filling volume:
The volume of excavation for:
The three prism method
When calculating the first grid along the contour of each square will be divided into a triangle (1 - 19)
Figure 1 - 19 according to the
您可能关注的文档
- 煤矿安全基本常识(Basic knowledge of coal mine safety).doc
- 煤矿须知(Notice of coal mine).doc
- 煤球机(Briquette machine).doc
- 煤炭资源开发利用方案编写内容及审查大纲(Contents and review outline of the scheme for the development and utilization of coal resources).doc
- 生产汽车扰流板 材质要塑料(Plastic material for automobile spoiler).doc
- 生产装配车间常用英语(Production assembly workshop common English).doc
- 生动地解释难懂的网络名词(A vivid explanation of obscure Internet Terms).doc
- 生个标准体重宝宝(Give birth to a standard weight baby).doc
- 生活百科201102(Encyclopedia of life 201102).doc
- 生活健康(Life health).doc
文档评论(0)