建筑施工要点(Main points of building construction).docVIP

建筑施工要点(Main points of building construction).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑施工要点(Main points of building construction) The construction points of.Txt The three elements of force size, direction and action. Force line is a straight line indicating the arrow in the force of intention. 2, seasonal construction mainly refers to the process of construction in winter and rainy season. 3, concrete pouring, free fall height should not exceed 2 meters, the vertical structure of not more than 3 meters. If exceeded, string should be used to prevent the occurrence of catheter tube, concrete segregation. 4, reinforced concrete structure composed of steel and concrete formwork, multiple sub project. 5, technical disclosure in writing, oral tests, supplemented by necessary drawings, the parties shall sign. 6 reinforced joints connecting method, overlap welding and threaded connection. 7, large volume concrete pouring, according to the characteristics of the structure can be divided into different segments, comprehensive layered layered, inclined layer Pouring Scheme etc.. 8, inspection and assessment of concrete is divided into statistics, non statistics two. 9, according to the use of waterproofing materials can be divided into flexible and rigid waterproof waterproof two categories. Group 10, the main form of masonry brick wall has a small, three small, Shun Shun Mei ding. Two, RadioButtonList (a total of 10 questions, each question 2 points) 1, the determination of concrete strength by the standard specimen is (C) mm. A. 70.7 x 70.7 x 70.7 B. 100 x 100 x 100 C. 150 x 150 x 150 D. 200 x 200 x 200 2, building a total width of 13m, roof slope is 2% (both sides of the slope, horizontal) roof height is the central rise (A) A, 130? B, 150? C, 200? D, 260? 3, the structure of seismic requirements, the stirrup hook straight part length should be at least (D) A, 3D B, 5D C, 6.25d D, 10D 4, to have anti permeability requirements of concrete curing time should not be less than (C) A, 3 days B, 7 days C, 14 days, 28 days D 5, the reinforced concrete structure co

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档