框架结构设计技术措施(Frame; structural design; technical measures).docVIP

框架结构设计技术措施(Frame; structural design; technical measures).doc

  1. 1、本文档共3页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
框架结构设计技术措施(Frame; structural design; technical measures) Frame; structural design; technical measures In the structure design of different types of some of the content is the same, such as floors, stairs, this article is intended to help the designer in the design of the frame structure. This paper can reduce the leakage, reduce errors, and the same content of the reader can skip. The details are as follows: 1. structural design notes Design is mainly based on seismic grade, air defense level, and the bearing capacity of the foundation, moisture impermeability practice, the value of live load, material grade, matters needing attention in the construction with details, general details or nodes, as well as in the construction not shown in the figure to express through that information. Such as the concrete alkali content shall not exceed 3kg/m3. 2. the structural layout of each floor, including: (1). The precast slab layout (plate selection, slab size and reinforcement). Mark number and type of the precast slab, do not use diagonal form. Because this method is easy to cause the crossing of the line, the horizontal or vertical lines should be adopted, and the type of room should be marked directly with the same type of room. Should be unified number of the whole floor, can reduce the design workload, but also facilitate the construction staff to look at. As far as the seam 40, the seam unworthy of the muscle or with a rib. The room layout from the inside out, as far as possible the use of wide plate slab with in the window, the best bandwidth of more than 200 cast-in-place slab (considering the riser wear plate plumbing). If the entire water layer construction requirements, seams should be greater than 60. The overall casting thickness is 50, with two-way phi 6@250, concrete C20. Generally, the pure frame structure does not need the whole casting layer. Prefabricated slabs shall not be allowed at constructional poles. The underground garage can not be prefabricated due

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档