- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
流程再造his数据模型设计(BPR, his data model, design)
BPR, HIS data model, design
The hospital system is established in the process of transaction management based on the variability of affairs caused system there are difficulties in the hospital from a transaction model to another transaction process migration, is a major cause of the current hospital in the implementation of HIS project failure, the data model cant meet the hospital, establish transaction management mechanism the new software is to solve problems and provide support for hospital survival ability, business process reengineering, forming the core competitiveness.
Objective: the core of BPR is customer satisfaction oriented business process and the core idea is to break the enterprises according to the function of the management, the business process, redesign the business management process, identify business processes as a whole, the pursuit of global optimum, rather than individual optimal.
Design concept
Separate process management, data access, user interfaces (data access, process paths), platforms, and so on. Refer to IBM (MQSeries)
Note: other outputs and the presentation layer are only a shell outside, and do not involve kernel problems.
One
Process management
1.1 is to do or do. In computer terminology, a program execution unit (unit) that accesses and may update various data items in a database. Transactions communicate messages and execute instructions by means of messages.
Transactions can be converted to executable processes. Systems can also be transformed into transactional processes. (system generally refers to the rules or rules of action that require everyone to abide by them, and also refers to the norms and specifications of laws, customs and regulations formed under certain historical conditions.)
The process can theoretically be converted into a single transaction vector.
Transaction vector: a directed event, a mover, a mover, and scalar data.
The preparation of procedures shall satisfy t
您可能关注的文档
- 掉头发(Lose hair).doc
- 材质球参数(Material ball parameters).doc
- 懂生活的精致女生!好东东(Understand the exquisite girl of life! Good east!).doc
- 材质设置fv(Material settings FV).doc
- 材质设置参数及测试出图(Material setting parameters and test drawing).doc
- 恶性肿瘤晚期患者需要认知差异引发的护患冲突与对策[1](Conflicts and Countermeasures of cognitive impairment in advanced cancer patients with cognitive impairment [1]).doc
- 恶性组织细胞病(Malignant histiocytic disease).doc
- 房产常识住房功能细分术语(Common sense housing function breakdown terminology).doc
- 槽钢尺寸 钢结构构件代号表(Code for dimension steel structural members of channel steel).doc
- 测绘 论文(Surveying and mapping paper).doc
最近下载
- 湖南省长沙市长郡雨花外国语学校2022年人教版小升初考试数学试卷(一)(含答案解析).docx VIP
- 福建省福州一中自主招生考试数学试卷.docx VIP
- 《企业内部控制》第18章 内部信息传递.pptx VIP
- 小学英语特色课程.doc VIP
- 肱骨骨折的护理查房.pptx VIP
- 浙江省台州市椒江区2023-2024学年八年级下学期期末数学试题(含答案).docx VIP
- 2025中考初中英语1600单词速记完整版(复习必背).docx
- 2025年哈尔滨供水集团有限责任公司人员招聘笔试备考试题及答案解析.docx VIP
- (正式版)S-H∕T3507-2024 石油化工钢结构工程施工及验收规范.docx VIP
- JT∕T 1094-2016 营运客车安全技术条件.pdf VIP
文档评论(0)