网站大量收购独家精品文档,联系QQ:2885784924

家装施工工序(Home improvement construction process).doc

家装施工工序(Home improvement construction process).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
家装施工工序(Home improvement construction process) Usually Jiezhuang project consists of hydropower engineering, engineering, engineering, Mason woodworking paint engineering and installation engineering. The general steps for home improvement projects: 1, by the designer, project manager, construction personnel and the owner of the site construction, construction engineering construction to be clear after the task of Party B. 2, hydropower industry entry pipes, wiring, water, drainage engineering, completion and acceptance of concealed works, for the next step. Hydropower is Jiezhuang hidden works links, in addition to not cut corners, outside of the Chong excellent workmanship is not sloppy, this is only for your reference circuit installation drawing decoration, hoping to help. The master bedroom air-conditioning installation of a loop; Ciwo a loop installation of air conditioning; Study of air conditioning installation of a loop; The kitchen installation of a loop; Install a loop of toilet; The main bathroom installed a loop; A circuit installation socket living room and a dining room, aisle; Living room, dining room, corridor lighting system, background wall, ceiling installation of a loop. 3, carpentry approaching, Mason woodworking project approach, according to the drawings, Mason waterproof requirements, must also check whether there is water, downstairs Water Leakage phenomenon, can be carried out under the step. 4, paint engineering approach, engineering construction, paint paint. 5, the installation work in the floor before installation, and then install the floor. Hydropower project 1, in the electrical construction before the test circuit, to the general trend of waterway, line pipe and the water pipe can not cross phenomenon, can not go below the floor water, kitchen and bathroom tiles below not cable pipe and wire. 2, in the case of composite floor, the ground must be dug, cement leveling; in the case of solid wood flooring, line pipe can be consistent wi

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档