- 1、本文档共37页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
BTEC Centre Guide for Lead Internal Verifiers (BTEC中心指南引导内部审核员)
BTEC Centre Guide for
Lead Internal
Verifiers
2016/17
Introduction
It’s a regulatory requirement for centres to identify a single Lead Internal Verifier
(Lead IV) for each BTEC (QCF) Principal Subject Area and each BTEC (NQF)
programme being delivered. This person acts as the point of accountability for the
quality assurance of these programmes.
As Lead IV, you are responsible for
• managing assessment and internal verification of units and qualifications.
• work with your Assessors and Internal Verifiers to agree an assessment and
verification plan for all cohorts from the start of the programme.
• ensuring that it is fit for purpose and meets regulatory requirements before
you sign it off.
This means that you should be involved in the assessment and delivery, and have
a good understanding of the units being assessed.
You’ll train or standardise your Assessors and Internal Verifiers to ensure that they
understand national standards. By sampling assessment and verification decisions
you’ll ensure that activity is completed in line with your plan and that standards are
applied consistently. You might only be completing the same amount of verification
of other staff but you need to ensure that you sample verification and assessment
across all qualifications you’re responsible for.
If a learner is unhappy with their result for an assignment, you can approve a single
resubmission to allow them to meet the assessment criteria targeted, providing:
• the learner submitted the work on time (or had an agreed extension)
• the tutor feels that the learner will be able to provide improved evidence
without further guidance
• the learner confirmed the work was their own (by signing and dating the
declaration) and the assessor has authenticated the evidence.
The tasks completed by the Lead IV are slightly different depending on the
framework you’re delivering so please select the relevant tab(s) bel
您可能关注的文档
- Blood Suffolk County Community College(血萨福克县社区学院).pdf
- Blood Pressure Fittings Adapters RMS Medical(血压配件和适配器 RMS医疗).pdf
- Blue Belt Stripe 1 – Drill 1 Mount Side Mount (蓝带条纹1 1钻山和侧装).pdf
- Blueprint Industrial Electronics 2051 2016 (蓝图工业电子 2051 2051).pdf
- Bluetooth HC06 with serial port module Easy (蓝牙HC06与串口模块容易).pdf
- Block Diagram Model of Lathe Machine WSEAS(车床机圆柱的框图模型).pdf
- BM SERIES aihti(BM系列aihti).pdf
- BMW Motorrad Maintenance Schedule R 1200 (宝马维修计划R 1200).pdf
- BMW R1100R Specifications BM Bikes(宝马R1100R规范 BM自行车).pdf
- BMW R1100RT Specifications BM Bikes(宝马R1100RT规范 BM自行车).pdf
文档评论(0)