- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
INSTRUCTIONS - COMP Cams(指令COMP凸轮)
INSTRUCTIONS
Camshaft Installation and Degreeing Instructions
4.6-Liter 4 Valve Engines
Thank you for choosing COMP Cams® products; we are proud to be your manufacturer of choice. Please read
this instruction sheet carefully before beginning installation, and also take a moment to review the included
limited warranty information.
This instruction sheet is broken down into several categories for ease of use. Some of the topics may not apply
to every application, but all of the information will be very beneficial during the cam installation process. If
there are any questions or problems during the installation, please do not hesitate to contact the toll free CAM
HELP® line at 1-800-999-0853, 7 a.m. to 8 p.m. CST Monday through Friday.
Camshaft Installation
Step 1: Prepare a clean work area and assemble the tools needed for the camshaft installation. The use of an
automotive manual is strongly recommended for help in determining which components must be removed from
your engine in order to expose the camshafts, camshaft sprockets and timing chain assembly. A good, complete
repair manual will save both time and frustration during the installation of your new camshaft set.
Step 2: Remove the intake manifold and valve covers from the motor.
Step 3: Remove spark plugs, crank pulley, damper and engine front cover.
Step 4: Remove the primary timing chains and outer camshaft sprockets.
Step 5: Remove the secondary timing chain assemblies after relieving the tension on the secondary drive
assembly by depressing the plunger and inserting a pin to lock it in place.
Step 6: Rotate the crankshaft keyway counterclockwise 90° from 12 o’clock (to about the 9 o’clock position).
Note that this step is vital in order to
您可能关注的文档
- Industrial Network Uninterruptible Power Supply (工业网络的不间断电源).pdf
- Industrial SensorsIndustrial Sensors Sharif(工业SensorsIndustrial传感器谢里夫).pdf
- INDUSTRIAL SPRING DRIVEN CABLE REELS (工业弹簧驱动电缆盘).pdf
- Industry Application IA08318001E Effective May (工业应用IA08318001E有效的可能).pdf
- INDUSTRY GUIDE LEAD GEN. KPI’S Essential Key (行业指导领导将军KPI的重要关键).pdf
- INEOS Polypropylene Processing Guide(英力士聚丙烯处理指南).pdf
- INDUSTRIAL TIRES Power King Tire(工业轮胎,轮胎王).pdf
- Industrial Screws and Fixing Materials (工业,螺丝和修复材料).pdf
- Inertia Classes Proposal - ICCT(惯性类提案国际清洁).pdf
- inertia and mechanisms FREE STUDY(惯性和机制,免费学习).pdf
文档评论(0)