- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Optimus Lower Completion Guide, manual mill(擎天柱低完成向导,手工磨)
AR-15 Lower Receiver Completion Guide
Manual Mill
Please carefully read these instructions in entirety before beginning.
Overview:
These instructions are meant to give you some direction in completing your Optimus Defense 80%
Lower Receiver. To complete the lower you will be drilling three holes and machining two pockets. To
keep the lower receiver within tolerance, pay close attention to the tolerances as you machine. We offer
recommended speeds, depths of cuts, and stick out lengths on the final page of this manual. This guide
will cover manually machining your lower. It is possible to use drill jigs or a CNC machine if you so
choose.
Cutters:
These tools are included in the Optimus Defense tool kit
available for purchase:
7/16” Endmill with a 3/8” shank
5/16” Endmill with a 3/8” shank
3/8” Stub split tip drill bit
5/32” Stub split tip drill bit
1/4” Precision ground rod for part zero
Other Tools:
Mill with Vise (needs to be squared)
Edge Finder or suitable touch off method Figure 1
Safety Glasses
Cutting Fluid (recommended but not required) such as A-9 or Tap Magic Aluminum
Dykem (blue dye) or dark color Sharpie
Manual Mill Drawings and Inspection Drawings (available at /documents)
Procedure:
Hammer and Trigger pin holes
1. Clamp the lower in the vise with the Lower’s left side
facing up.
Note: Place the lower on parallels or a sacrificial parallel block to avoid
drilling the vise.
2. Zero X and Y; Place the 1/4” precision rod in a tool
holder and center the rod over the take down hole.
Adjust the table until the rod drops smoothly and
easily into the take down pin hole. See Figure 2.
您可能关注的文档
- NUTRIENT DEFICIENCY SYMPTOMS(营养缺乏症状).pdf
- Nuts Heavy Hex Dimensional Information ITP(坚果重型六角维度信息国际旅游业伙伴关系).pdf
- Nuts to You! Permaculture Activist Magazine(坚果!).pdf
- Nuto H Series Chemical Corporation(Nuto H系列化学公司).pdf
- NX CAM – Siemens Sinumerik Post Builder(NX凸轮西门子利用西门子建设者).pdf
- NVIDIA GRID Datasheet(英伟达网格数据表).pdf
- NX CMM Inspection Programming BuildIT (NX CMM检验编程BuildIT).pdf
- NX Laminate Composites Siemens(NX层压板复合材料西门子).pdf
- Nylon Insert Locknuts AllMetal Locknuts Free (尼龙插入锁紧螺母全金属锁紧螺母自由).pdf
- NXP Security Innovation Encryption for ARM (NXP &安全创新加密的手臂).pdf
文档评论(0)